Jul 24, 2013
I need a similar function to determinate difference between two dates, but i need other business hours; Monday - Friday: 9:00 - 21:00 (this is OK)Saturday: 09:00 - 14:00 (and this is my problem, how to add this condition in this function)
View 4 Replies
ADVERTISEMENT
Aug 15, 2011
I have a field in Customers table called shipeddate....
I wnat to check the number of hours an item which has a shipeddate is in the store room to the current datetime...
But the business hrs of the store room are from 8am-5pm..
So when a shipped date is 4pm on MOnday
and i am checking on 9 am Tuesday the number of hrs shud be 1(4-5 of Monday)+1(8-9 of tuesday) =2hrss..
How can i achieve this...
View 2 Replies
View Related
Sep 19, 2010
format of dtActivityStartDate/dtActivityFinishDate: 2010-09-17 14:50:51.150 Note: Both dtActivityStartDate/dtActivityFinishDate
vcActivityName = Process Request
usdFuncTimeCalc (vcActivityName,dtActivityStartDate, dtActivityFinishDate)
i need to calculate time elasped for that type of activity following are the rules:
(If Process Request is the activity)
Working Days: Monday through Saturday
Hours of Operation: 9AM 5PM
only working hours of day need to the counted like for example if it is sep 15 11 Am is dtActivityStartDate & Sep 17 is dtActivityFinishDate is 10 Am. then time elapsed is 11am to 5pm on sep 15 , 9 to 5 on sep 16 & 9 to 10 on sep 17 so total should be
6+ 8 + 1 = 15 hours + minutes.
format of date time: 2010-09-17 14:50:51.150
vcActivityName = Process Request
Don't worry about process request..
View 4 Replies
View Related
May 20, 2013
i have table name order table . in that i have column name install date,order date.
the difference bet ween order date and install date should be greate than or equal to 3 working days.
fri and sat are holidays.
i need one query to find the difference betwwen orderdate and install date is greate than 3 working days
View 3 Replies
View Related
Mar 17, 2011
I have a query that uses a function to find the business days between two dates.It sums the total number of days between two dates per employee to find the total days for the past 30, 90, or 365 days.
The problem is that the query takes 21 second to return the last 30 days.Over 70 second to return the last 90 days and over 140 second to return the last 365 days.Do you know how I could tune the query to return faster? Below is the query for the last 30 days:
select dwt_emp_id, SUM((SELECT GET_BDAYS(DWT_DATE,DWT_CREATE_DATE) FROM DUAL))
from dwt_dvt_work_time where dwt_create_date > sysdate - 30
and dwt_hours > 4 and dwt_usr_uid_created_by <> -1 group by dwt_emp_id order by dwt_emp_id
Here's the function:
CREATE FUNCTION get_bdays (d1 IN DATE, d2 IN DATE)
RETURN NUMBER
IS total_days NUMBER(11,2);
holiday_days NUMBER(11,2);
[code]....
View 1 Replies
View Related
Jul 24, 2013
I have the following code which will produce a list of dates -
SELECT to_date('01-Jan-2013','DD-Mon-YYYY') + rownum - 1
FROM all_objectsWHERE rownum <= to_date('31-Jan-2013','DD-Mon-YYYY') - to_date('01-Jan-2013','DD-Mon-YYYY') + 1 01/01/201302/01/201303/01/201304/01/2013.....30/01/201331/01/2013
But what I'm looking for is a way to also include all possible hours with the dates, so my output would be like -
01/01/2013 0001/01/2013 0101/01/2013 0201/01/2013 03...31/01/2013 2131/01/2013 2231/01/2013 23
View 5 Replies
View Related
Sep 28, 2011
SELECT emp.emp_id, emp.ename, TRUNC (attendancedatetime),
TRUNC ( ( 86400
* (MAX (attendancedatetime) - MIN (attendancedatetime))
)
/ 60
)
- 60
[Code]...
Following is the out put:
EMP_IDENAME Date Min Hrs
10013Javed Iqbal09/20/2011 00:00:0036.007.00
10013Javed Iqbal09/21/2011 00:00:0027.007.00
10013Javed Iqbal09/22/2011 00:00:0049.007.00
10013Javed Iqbal09/23/2011 00:00:000.000.00
10013Javed Iqbal09/24/2011 00:00:000.000.00
i need the TOtal sum of Minutes and Hrs e.g 7+7+7=21 and also minutes but if minutes total increase from 60 minutes then it should add to hrs .how to get sum.
View 2 Replies
View Related
Jun 25, 2011
i have two dates like
30-may-2011 11:50:34 and 27-may-2011 13:59:37
how i can calculate proper hrs between these dates? My condition is time calculate from 8.30AM to 5.30PM
it does not considered 24 hrs
if i calculate hrs
30-may-2011 11:50:34 - 27-may-2011 13:59:37
then it shows 69.85 hrs . but it considered full 24 hrs.
View 5 Replies
View Related
May 27, 2011
Oracle Version = 8.1.7.4
How to change the SQL below to include a calculated datetime diff between two consecutive dates?
I believe I should be using what SQL gurus will call hierarchichal/analytical queries? Any good website/link to learn hierarchical/analytical queries.
select last_analyzed, monitoring
from dba_tables where owner = 'TEST'
LAST_ANALYZED MON
-------------------- ---
24-MAY-2011 18:25:05 YES
24-MAY-2011 19:15:34 YES
24-MAY-2011 22:21:33 YES
24-MAY-2011 23:10:42 YES
24-MAY-2011 23:51:10 YES
25-MAY-2011 01:43:56 YES
25-MAY-2011 02:39:11 YES
25-MAY-2011 03:10:26 YES
25-MAY-2011 04:15:15 YES
25-MAY-2011 04:23:26 YES
28-MAY-2011 03:58:02 YES
28-MAY-2011 03:58:11 YES
28-MAY-2011 03:58:11 YES
28-MAY-2011 03:58:12 YES
28-MAY-2011 03:58:13 YES
28-MAY-2011 04:00:16 YES
28-MAY-2011 04:04:24 YES
28-MAY-2011 04:04:27 YES
28-MAY-2011 04:04:33 YES
28-MAY-2011 04:04:36 YES
View 2 Replies
View Related
May 3, 2012
select to_date('25-04-2012', 'DD-MM-YYYY') + rownum -1 dt
from dual
connect by level <= to_date('05-05-2012', 'DD-MM-YYYY') - to_date('25-04-2012', 'DD-MM-YYYY') + 1;
The above query returning the following output,
DT
04/25/2012
04/26/2012
04/27/2012
04/28/2012
04/29/2012
04/30/2012
05/01/2012
05/02/2012
05/03/2012
05/04/2012
05/05/2012
here I need to exclude the Dates which comes on 'saturday' and 'sunday' and also the common holiday..Here it is '01-May-2012' and I need the output like the following,
DT
04/25/2012
04/26/2012
04/27/2012
04/30/2012
05/02/2012
05/03/2012
05/04/2012
I need the common query to calculate between any two dates.
View 2 Replies
View Related
Jan 10, 2012
how to calculate the difference between multiple dates at the same time..
Select to_date('10/10/2011','mm/dd/yyyy')
- to_date('09/10/2011','mm/dd/yyyy')
- to_date('08/10/2011','mm/dd/yyyy') from dual;
Giving me an error...
ORA 00932 : inconsisten data types:expected DATE Julkian got DATE..
View 8 Replies
View Related
Sep 22, 2011
create or replace function getDate(p_joing_date Date,p_sysdate)
Return Date;
IS
v_compltd_mnths;
BEGIN
SELECT into v_compltd_mnths MONTHS_BETWEEN(TO_DATE('sysdate','MM-DD-YYYY'), TO_DATE('joing_date','MM-DD-YYYY') ) "Months"FROM DUAL;
return v_compltd_mnths;
END;
that i have worte..
View 3 Replies
View Related
Sep 25, 2012
how to caluclate days between two dates of single timestamp filed and with this
query
Select * from m_activity_transaction where actn_opp_id in (
Select actn_opp_id from m_activity_transaction where ACTN_ACTV_ID = 218
Group by actn_opp_id
[code]...
and i nedd to caluclate no.of days between two dates like 27-JAN-12 11.06.20.000000 AM and 08-FEB-12 05.32.54.000000 PM where actn_id is unique AND ACTN_OPP_ID IS NOT UNIQUE.
View 6 Replies
View Related
Feb 17, 2010
I want Oracle stored function/procedure to calculate number of working days between two dates. We need to exclude Firdays and Saturdays as there are weekend holidays and also exclude official holidasy that lie between two dates.
View 7 Replies
View Related
Dec 15, 2011
I have to procedure that computes number of project, and average working hours of employees where employee id is passed as a parameter to the procedure. If the average working hours is less than 10 then employee's salary remain the same, otherwise check if number of project is less than 4 then 5% of salary, else 10% of salary is added to the salary.
my tables are:
CREATE TABLE employee(
empid number(5),
empname varchar(20),
address varchar(20),
no_of_dependents number(5),
deptno number(5),
CONSTRAINT EMPLOYEE_PKEY PRIMARY KEY(empid),
CONSTRAINT EMPLOYEE_FKEY FOREIGN KEY(deptno) REFERENCES department(deptno));
[code]...
the problem is i have to use only 2 cursors - 1 for select and 1 for update.
View 27 Replies
View Related
Oct 12, 2012
table = lookup_table. contains a date and an ID for that date. this is manually populated for a few years ahead. Some dates seem to be missing though.
e.g.
LU_Date LU_ID
01/01/2012 1
02/01/2012 2
03/01/2012 3
05/01/2012 5
So I want to highlight the fourth. how to write the following code
select (every possible day since table started)
where that_day is not in (select lu_date from my lookup_table
View 7 Replies
View Related
Dec 6, 2010
I need to calculate first business day of a given month . Below is complete explanation
Business day=sould not include weekends and holidays.
In a table say ACTIVITY_XX I have all the month begin dates say 01-JAN-2010,01-FEB-2010,01-MAR-2010,01-APR-2010 and so on..and I have a HOLIDAY table where all the holidays are stored.
So using the above info I need to calculate the first business day for a given month. I guess this cannot be done by using a simple SQL query? I was wondering how could it be written using a PL/SQL function.
I'll be passing the month begin date as parameter..so the function should return the first business day for that month.
View 16 Replies
View Related
Mar 12, 2013
i have business units for which i have multiple department ids so just wanted to have dept ids order by business units
View 12 Replies
View Related
Aug 19, 2013
We need some transformation rules on Source employee table which comes from SAP and want to load in Target table.Basic idea is we need to calculate time when position was not held by sub owner so . . . Etc
Source looks like:
POSITION_TCD START_DT END_DT SUBTYPE POSI_HOLDER
Example 1:
10005822 10/16/2003 11/20/2008 A008 105404
10005822 10/16/2003 3/31/2009 A999 105404
10005822 6/23/2008 7/5/2009 A008 124530
10005822 11/21/2008 8/31/2009 A008 105404
10005822 8/31/2009 4/16/2010 A008 105323
10005822 4/19/2010 12/31/9999 A999 131995
10005822 7/5/2010 12/31/9999 A008 131995
Example 2:
10084408 5/3/2010 12/31/9999 A008 130591
10084408 3/21/2011 5/17/2011 A008 132725
10084408 5/3/2010 1/2/2011 A999 130591
After business rules data should look like:
Target
Example 1:
POSITION_TCD POSI_HOLDER SUBS_OWNER EMP_ASSI_TYPE START_DT END_DT
10005822 105404 105404 Hold=Subs 10/16/2003 11/20/2008
10005822 124530 105404 Hold<>Subs 6/23/2008 3/31/2009
10005822 124530 No Substantive No Substan 4/1/2009 7/5/2009
10005822 105404 No Substantive No Substan 11/21/2008 8/31/2009
10005822 105323 No Substantive No Substan 8/31/2009 4/16/2010
10005822 No Holder 131995 No Holder 4/19/2010 7/4/2010
10005822 131995 131995 Hold=Subs 7/5/2010 12/31/9999
Example 2:
10084408 130591 130591 Hold=Subs 5/3/2010 1/2/2011
10084408 130591 No Substantive No Substan 1/3/2011 12/31/9999
10084408 132725 No Substantive No Substan 3/21/2011 5/17/2011
View 1 Replies
View Related
Jan 26, 2011
I want to find the dates which have a date plus with in 2 days after this date. I mean group by 3 days each even the date i missing between two days. Actualy I want to find the start date where the employ was missing on job.
Basic concept is employes have allowed to use 10 personal leaves of a year. Each leave can be use for maximum 3 days.
If employ did not come on the job for one day or two days or three days, it shoul be count as ONE personal leave. And If employ is missing at job for four or five days, it should be count as 2 personal leaves.
seq date
------------------------------
101.01.10
205.01.10
306.01.10
410.01.10
512.01.10
613.01.10
714.01.10
815.01.10
916.01.10
1018.01.10
1119.01.10
1220.01.10
1321.01.10
1423.01.10
1526.01.10
1627.01.10
1729.01.10
1831.01.10
The result should be (Don't use Pl/Sql)
seq date
------------------------------
101.01.10
205.01.10
310.01.10
413.01.10
516.01.10
619.01.10
723.01.10
826.01.10
929.01.10
After finding these days I want to select the starting date of 5th personal leave. (which is 16.01.10).
I am not a expert of using SQL, but I think it could be possible with using partitioning a table on the givin reslult and further partition the reslut on rownum() as rn and the using case statement where rn = 5.
View 2 Replies
View Related
Mar 10, 2011
Split a date into new dates according to black out dates!
Here is my tables:
CREATE TABLE travel
(
start_date,
end_date
)
AS
SELECT DATE '0000-01-01', DATE '9999-12-31' FROM DUAL;
[code]....
I have lets say a "travel date" and black out dates. I will split the travel date into pieces according to the black out dates.
Note: Travel Date can be between 0000-01-01 - 9999 12 31
Sample:
Travel Date:
Travel | START DATE | END DATE
T | 2011 01 04 | 2011 12 11
Black Out Dates:
BO | START DATE | END DATE
A | 2010 11 01 | 2011 02 11
B | 2011 01 20 | 2011 02 15
C | 2011 03 13 | 2011 04 10
D | 2011 03 20 | 2011 06 29
Excepted Result:
New Travel | START DATE | END DATE
X1 | 2011 02 16 | 2011 03 12
X2 | 2011 06 30 | 2011 12 11
Visually:
Travel Date : -----[--------------------------]--
A : --[------]-------------------------
B : ------[---]------------------------
C : --------------[---]----------------
D : ----------------[------]-----------
Result :
X1 : -----------[--]--------------------
X2 : -----------------------[--------]--
Sample 2:
Travel Date : -[--------------------------------]--
BO Date A : ----[------]-------------------------
BO Date B : -------------------------[---]-------
BO Date C : ----------------[---]----------------
BO Date D : ------------------[------]-----------
Result X1 : -[-]-------------------------------
Result X2 : -----------[--]--------------------
Result X3 : -----------------------------[--]--
How can I do it using PL SQL ?
View 5 Replies
View Related
Sep 9, 2010
I want to try installing Oracle E-business suite on Mandriva But when I try e.g. domainame I get blank.
A) How can I check my domainname ?How can I set it?Here is the hosts file
[Select all] [Show/ hide]
127.0.0.1 localdomain
192.168.0.2 david.domain.com david
View 3 Replies
View Related
May 5, 2011
I have been asked to see why a sister company cannot access multiple business areas through a single responsibility. At present, if they log in through a GL responsibility they can see all GL folders, items and the returned data. If they then go to the AP business area, they can see the folders and items, but when they run a report they get an error message 'Query returned no data' - but if they run the same query using an AP responsibility they get the correct results. I have looked at their user set up, and it seems fine i.e. has access to all business areas and required priveledges.
View 4 Replies
View Related
Oct 22, 2003
How can I select all of the dates between two dates? For example, given the start date 12/2/2003 and the end date 12/5/2003 I want to return:
12/2/2003
12/3/2003
12/4/2003
12/5/2003
Is there a built in function for this? Is there a way for a function to return multiple rows? It has to be a function because I need to use it within other SQL statements.
View 14 Replies
View Related
Jan 10, 2011
I want to write a function that gets:
1. event_date (dd/mm/yyyy)
2. event_start_time (??/??/???? HH24:MI)
3. event_end_time (??/??/???? HH24:MI)
I got a table called EVENTS that got 2 fields:
1. event_date (dd/mm/yyyy HH24:MI)
2. event_end_date (??/??/???? HH24:MI)
and want to check if there is an event in my EVENTS table that occurs in the same dd/mm/yyyy as the input, and can disturb the input event times. means:
input.event_start_time is between EVENTS.event_date
and EVENTS.event_end_date
and
input.event_end_time is between EVENTS.event_date
and EVENTS.event_end_date
but to compare only the hours here! (HH24:MI)
because the date (dd/mm/yyyy) is checked before..
I don't know how to cut only the hours out of the date and compare them, and don't know how to write the whole function.
View 2 Replies
View Related
Dec 27, 2010
I have a table which will the following type of data
"COL1""COL2"
1001"27-DEC-2010 02:00:00"
1002"27-DEC-2010 07:00:00"
1003"27-DEC-2010 09:00:00"
1004"27-DEC-2010 02:00:00"
1005"27-DEC-2010 12:00:00"
Here you can see that we have data for 27th Dec 2010 02,07,09 and 12 hours. I want a query which will show the full 24 hours data even if it doenst have any records. like the following,
COL1 COL2
0 2010122701
1001 2010122702
1004 2010122702
0 2010122703
0 2010122704
0 2010122705
0 2010122706
1002 2010122707
View 2 Replies
View Related
Oct 22, 2012
i am using one query but not getting correct minutes.
here is my query:
v_Interval:= to_timestamp(v_temphrs,'HH24:MI:SS')-to_timestamp(v_outpunch1,'HH24:MI:SS');
v_TotalHrsMin1 := extract(hour from v_interval) * 60 + extract(minute from v_interval);
here v_interval datatype is "interval day to second" and v_temphrs datatype is varchar2 and value is : 12:00:00 and v_outpunch1 datatype is varchar2 and value is: 06:10:00
and v_totalHrsMin1 datatype is number.
here i should get value 370.
but i am getting value 350.
View 3 Replies
View Related
May 8, 2010
I am using the below sql query to calculate working hours. The problem which i am facing is that query is taking lot of time to calculate the working hours. reduce the execution time of this query or if there is any other way to calculate working hours
The following query take 63.499 sec
SELECT sql_calc_found_rows gstime,
MAX(stoptime) AS mx,
MIN(starttime) AS mn,
[Code].....
View 6 Replies
View Related
Jan 1, 2013
I want to convert below MS-SQL query in oracle 10g.
for eg:
Select numasdate,
Cast(numasdate / 60 as Varchar) + ' hours ' +
Cast(numasdate % 60 as Varchar) + ' minutes'
as [TotalHoursAndMinutes]
From
#SampleTable
Output:
9436 157 hours 16 minutes
537 8 hours 57 minutes
9323 155 hours 23 minutes
12525 208 hours 45 minutes
View 8 Replies
View Related
Oct 4, 2012
I have a table with a date field. This field storage dates with hours like this:
01-08-2012 8:30:00
01-08-2012 8:15:00
01-08-2012 9:30:00
01-08-2012 9:40:00
02-08-2012 8:30:00
02-08-2012 9:30:00
02-08-2012 9:34:00
...
I have to generate a report with the day and the frequency :
__Day_______ Hour Range__CountRecords
WEDNESDAY 8 - 9 2
WEDNESDAY 9 - 10 2
THURSDAY 8 - 9 3
The block of the hour must be 1 hour (8-9,9-10 and so on)
how generate the hours range.
My database oracle version is 8i. (I know that is very old but I can't change because It´s a legacy system).
View 5 Replies
View Related