Scheduler :: How To Remove A Created Job And Stop / Change A Scheduled Job
Jan 7, 2013
I copied a sqlplus scheduled job procedure. Procedure successfully created .I fount it here [How to Schedule RMAN Daily Backup? [URL]
The procedure is successfully created. Now, doing the following operations:
1) running that job
2) checking whether that job is running or not
3) listing all other jobs
4) unschedule a scheduled job
5) delete a job
6) edit a job
View 3 Replies
ADVERTISEMENT
Jun 5, 2013
-- Scheduler details
BEGIN
dbms_scheduler.create_schedule(
schedule_name => 'INTERVAL_EVERY_1_MINUTES',
start_date => trunc(sysdate)+18/24,
repeat_interval => 'freq=MINUTELY;interval=1',
comments => 'Runtime: Every day all 1 minutes');
END;-- program code
BEGIN
[code]....
all above three code compiled successfully . but it is not running automatically and not run every 1 minute.
I try to run this manuall by using following code
BEGIN
dbms_scheduler.run_job('JOB_FEED_UK_DATA',TRUE);
END;
It works fine..
create or replace
PROCEDURE LOAD_CUSTOMERS_UK
IS
BEGIN
Insert into CUSTOMERS_UK (ID, NAME, CITY) VALUES (1,'SMITH','LONDON');
Insert into CUSTOMERS_UK (ID, NAME, CITY) VALUES (2,'JONES','LONDON');
Insert into CUSTOMERS_UK (ID, NAME, CITY) VALUES (3,'BROWN','BRIGHTON');
[code]....
View 12 Replies
View Related
Feb 27, 2013
How to find currently running scheduled jobs using query !?
View 3 Replies
View Related
Jun 1, 2011
There is one maintenance job owned by SYSMAN running continuously. I want to stop that scheduler job .How ?
IS this the correct syntax to stop the running job ?
exec dbms_scheduler.stop_job(job_name=>'jobname');
View 1 Replies
View Related
Nov 13, 2011
How to stop all jobs(dbms_scheduler) when ever database down or power failure and I need to restart all jobs when ever database is up.
View 3 Replies
View Related
Aug 9, 2013
We have a scheduler chain that calls 2 scheduler programs.The chains are controlled by a scheduler job that has job_type as CHAIN.My challenge is how to add email notifications on the failure or success of the programs.
I know about this procedure DBMS_SCHEDULER.ADD_JOB_EMAIL_NOTIFICATION, but this is only applicable to jobs and not programs(i believe). Is there an alternative way to trigger off emails for scheduler programs ?
View 0 Replies
View Related
Feb 14, 2013
Is there a way to find when was a database role created and who has created?
View 5 Replies
View Related
Aug 17, 2012
tell me if a REFRESH GROUP is automatically created when a materialized view is created?
View 3 Replies
View Related
Aug 30, 2011
I have set up two scheduled jobs in oracle 11g for executiong a procedure in specific time intervals. One as Hourly and other as minutely.But the scheduled jobs are not running as per schedule. i.e the minutely job is not running every minute. But If i see the run logs for some period it would have run every minute, and suddenly it will not execute and give a gap of 30 mins or 1 hour and then run again.
P.s. The job priority is set as 3. and except for these two jobs there are no other jobs set. But this is an important job which needs to be run every minute.
JOB_QUEUE_PROCESSES is set to 1000, which is max. And there are only 3 scheduled jobs in the whole DB.
BEGIN
SYS.DBMS_SCHEDULER.CREATE_JOB
(
job_name => 'LOGTBLPURGE'
[code]....
View 2 Replies
View Related
May 12, 2010
A procedure in a package uses a database link. The database link is defined without a username and a password. The user that uses the database link is supposed to be present in the opposite database as wel.
When the procedure is started in SQL*Plus or TOAD it runs perfect. But the procedure has to run in a scheduled job. And that doesn't work. The procedure fails because of: ORA-01017 invalid username/password. The user that is used to run the scheduled job is the right one.
View 5 Replies
View Related
Jul 12, 2012
I have created a materialized view log on table testing_mview_rev in 11g:
SQL> CREATE MATERIALIZED VIEW LOG ON testing_mview_rev WITH ROWID;
Materialized view log created.
And a MV on it in 10g:
SQL> create materialized view testing_mview_1_rev REFRESH Force start with (sysdate) next (sysdate+1/1440) with rowid as select * from testing_mview_rev@S58_TO_S56;
Materialized view created.
Now this is suppose to automatically refresh itself every minute but refresh is failing. However manual refresh is working fine.
what I have missed here. is there any other way to schedule the MV to run every minute?
View 13 Replies
View Related
Oct 11, 2012
I have a job running under HUMADM user and would like disable or drop it.I do not have the login credentials of HUMADM user but can log into the database as system/sys user.
When I run the below commands as sys/system user it says humadmjob must be a job or it is not running.This is because it is looking for the job under sys/system user.
exec DBMS_SCHEDULER.drop_job (job_name => 'humadmjob');
exec DBMS_SCHEDULER.stop_job (job_name => 'humadmjob');
SELECT owner, job_name, job_class, enabled FROM dba_scheduler_jobs;
OWNER JOB_NAME JOB_CLASS ENABLED
====== ========= ======= ======
HUMADM HUMADMJOB DEFAULT_JOB_CLASS TRUE
how to stop/disable this job? My oracle version is Oracle Database 10g Enterprise Edition Release 10.2.0.2.0 - 64bi
View 8 Replies
View Related
Jun 22, 2010
am facing an issue with scheduled jobs. The below script will create a scheduled job to insert a record for every 2 mins into the table "job_table".
--Table script
CREATE TABLE job_table (now DATE);
--Stored procedure run by scheduled job
CREATE OR REPLACE PROCEDURE test1 IS
BEGIN
[code]...
The scheduled job does not require any special grant privillege as the PUBLIC has access to run it. Anyhow the same set of instruction working for my friend on his machine but not on my environment.
View 12 Replies
View Related
Oct 24, 2012
I have a 11.2.0.1 database windows 2008 server. I have RMAN with nocatalog. I need to take daily RMAN backup of database at 6 PM.
I want to schedule this RMAN backup to run automatically. I want to run this backup when I am not logged on.
View 2 Replies
View Related
Jun 26, 2011
We are using one application. This application is having 2types of jobs. Under each job again there are each 5 sub jobs. All the jobs are scheduled jobs. Now the requirement is The main 2 jobs we are going to run on some specified days( for this we need to mention on what days we want to run.once we gave those day the next steps will start).
for example 1 main job is scheduled on Monday ( we need to schedule it on monday-- we need to write a program for this) under this every sub job will run.these sub jobs are dependent jobs.if sub job completed successfully it should send an email to the distributed mail group which says like " <Job_name> completed successfully" if it fails also it needs to send an email to the distributed group. for each sub job it should send either success/falure mail to the distriuted mail group.
once after completing all the sub jobs successfully it should send a mail to the distributed mail group saying that The main job got completed successfully.these two main jobs will run paralelly but the the second main job will run after 30 mins of 1st job starts.
in the second job also will work as same as job1 process.it should also send mails to the distributed mail groups.The jobs are already scheduled.No need to scheduled the jobs.need to write a pl/sql program like it will check all the jobs and respected sub jobs if any thing got completed/failed it should send an email to the distributed mail group automatically. For that it should monitor all the jobs..that's the requirement.
I have already scheduled all the jobs. now want to write a script for the above requiement.
View 3 Replies
View Related
Sep 13, 2010
changing the user for a job.
There are 2 jobs which are scheduled in database by a user XX.
Now I need to make these scheduled jobs run by user YY.
In order to do this do I need to disable the jobs scheduled by XX and then create same jobs as before under the new user YY.
View 9 Replies
View Related
May 17, 2011
i have batch file name exptab,to export all table in database
for example
@echo off
exp scott/tigger tables=emp file=C:impemp.dmp LOG =C:implog1
batch file working fine when i click on it,
I need to use the Scheduled Tasks in windows 2003 so when the computer startup batch file will run automatically i follow all the step but its not working i try the same story with windows xp still problem exist .
View 6 Replies
View Related
Sep 19, 2011
As I was observing the space issues on my db server. I found that there is lots of Trm and Trc file which is being created very much frequently. Due to this its consuming lots of space even the size of each files is not more than 1Mb.
For cleaning I am deleting all the trm and trc files mannully using DEL command Os level. How can i schedule the purging of trm and trc files.
View 3 Replies
View Related
Jun 20, 2010
Is there any way to find the last run duration of a job which was scheduled using DBMS_JOB?
View 3 Replies
View Related
Sep 11, 2013
Yesterday, there were performance issue at server. So today, when i am generating report for that particular period, found snapshot id sequence is serially but with skipped hourly timed. Instead of generating report at 15:30, it generated at 16:30.
Enter value for num_days: 2
Listing the last 2 days of Completed Snapshots
Snap
Instance DB Name Snap Id Snap Started Level
------------ ------------ --------- ------------------ -----
tagidev TAGIDEV 2857 10 Sep 2013 00:30 1
2858 10 Sep 2013 01:30 1
2859 10 Sep 2013 02:30 1
2860 10 Sep 2013 03:30 1
2861 10 Sep 2013 04:30 1
2862 10 Sep 2013 05:31 1
[code]....
Below are the details at alert log -
Tue Sep 10 14:28:20 2013
Thread 1 cannot allocate new log, sequence 7029
Checkpoint not complete
Current log# 2 seq# 7028 mem# 0: E:APPORACLEORADATATAGIDEVREDO02.LOG
Thread 1 advanced to log sequence 7029 (LGWR switch)
[code]....
1) why snap didn't started at 15:30?
2) since database just started at the scheduled time of AWR snap time. But generated at 16:32 instead of 16:30, though last services "SMCO" is started at 16:42. How it snap id generated for this particular time?
3) what does "kewastUnPackStats(): bad magic 1 (0x000000001B3CE48D, 0)" mean?
View 7 Replies
View Related
Jan 18, 2013
There is a readonly user on our reporting server. Developers want to use global temporary tables with this user. I don't want the user to have permissions other than readonly.I can grant the user CREATE TABLE privilege and did not grant quota on any permanent tablespace, therefore user would not be unable to create permanent tables but still should be able to create global temporary tables.
Question is would a user with such permissions still be able to utilize temp tables as part of a scheduled job?
View 2 Replies
View Related
Jul 3, 2010
i want check some data from one process instead of last record
i.e
process data
uuu 1
2
3
4
ppp 1
2
3
4
[code].....
View 2 Replies
View Related
Jan 31, 2012
how to stop going to next record if it finds the last record. Because when i click my next button(it is the last record), i try to click my previous or first button but it won't go back, enter-query mode is the error message.
View 9 Replies
View Related
Apr 1, 2012
HOW TO STOP THE UPDATE IN PK COLUMN?
View 3 Replies
View Related
Nov 28, 2011
the below issue.
I want to schedule the procedure - SMTP_PROCEDURE2. Which should run every day at 5 PM. The owner of this procedure is 'bkpusr'.
In SYS login. i am running the below script, but it is not working out. what could be the problem.
DECLARE
BEGIN
DBMS_SCHEDULER.CREATE_JOB (
job_name => 'TRIGGERING_THE_SMTP_PROCEDURE',
job_type => 'STORED_PROCEDURE',
job_action => 'BKPUSR.SMTP_PROCEDURE2',
[Code]....
View 11 Replies
View Related
May 25, 2011
SQLserver in stop condition when i play it. it again stop
View 1 Replies
View Related
Apr 9, 2012
I'm trying to install additional Oracle products on my XP VM, but it is telling me to kill all running oracle products. It states that by running the Oracle utility: oradim80 or the Windows NT service Control Panel I can stop all of these services, but I cannot find either.
View 2 Replies
View Related
Nov 3, 2010
I have a form with multiple data block. When i want to query and go to next record then this displayed a message "Do you want save changes". But i would like to stop this message(i.e would not see the message) is it possible.
View 3 Replies
View Related
Feb 7, 2010
I have master detail datablocks. Master block is course and detail block is trainee. students can schedule their courses in a location at particular time.
lets assume student1 has scheduled course A1 in location LA1 from 9am to 12 pm. Now second student shouldn't be able to schedule same course at same time in same location. He can schedule at different time duration. or else same time duration but different location. Or same time, same location but different course.
so, what i did is, i wrote code in when-validate-record of trainee block to display a message saying " cannot schedule course.choose another time." if he try to insert same time duration or same location .
when i am trying to insert a record with time which is already scheduled and in same location, it displays the message but it is also saving the record. i don't want to save the record.
how should i do this? i tried to give ROLLBACK in this trigger but it doesn't accept. i tried pre-insert trigger also but it is also displaying message but saving the record
my code in when-validate-record is:
declare
cursor c1 is
select start_time,end_time,loc
from trainee
where cname=:course.cname;
[code].......
View 5 Replies
View Related
Aug 27, 2013
We are runing (Version: Application Express 4.1.1.00.23)I need to reboot the server.How do I stop APEX gracefully and start it back after?
View 8 Replies
View Related