SQL & PL/SQL :: Scheduled Job Not Running As Per Schedule

Aug 30, 2011

I have set up two scheduled jobs in oracle 11g for executiong a procedure in specific time intervals. One as Hourly and other as minutely.But the scheduled jobs are not running as per schedule. i.e the minutely job is not running every minute. But If i see the run logs for some period it would have run every minute, and suddenly it will not execute and give a gap of 30 mins or 1 hour and then run again.

P.s. The job priority is set as 3. and except for these two jobs there are no other jobs set. But this is an important job which needs to be run every minute.

JOB_QUEUE_PROCESSES is set to 1000, which is max. And there are only 3 scheduled jobs in the whole DB.
BEGIN
SYS.DBMS_SCHEDULER.CREATE_JOB
(
job_name => 'LOGTBLPURGE'

[code]....

View 2 Replies


ADVERTISEMENT

Scheduler :: Find Currently Running Scheduled Jobs Using Query

Feb 27, 2013

How to find currently running scheduled jobs using query !?

View 3 Replies View Related

Server Administration :: Job Not Running On Defined Schedule

Jul 24, 2012

I migrate schema with data from oracle 10gR2(Windows) to oracle RAC 11gR2 (Linux).My JOBS are created but they are not running on defined schedule. but they run manually successful.

----script of my job are as below --------

BEGIN
SYS.DBMS_SCHEDULER.DROP_JOB
(job_name => 'JHON.TAX_IT);
END;
/
[code]...

View 6 Replies View Related

SQL & PL/SQL :: Using A Database Link In A Scheduled Job?

May 12, 2010

A procedure in a package uses a database link. The database link is defined without a username and a password. The user that uses the database link is supposed to be present in the opposite database as wel.

When the procedure is started in SQL*Plus or TOAD it runs perfect. But the procedure has to run in a scheduled job. And that doesn't work. The procedure fails because of: ORA-01017 invalid username/password. The user that is used to run the scheduled job is the right one.

View 5 Replies View Related

MV-Scheduled Refresh Failure?

Jul 12, 2012

I have created a materialized view log on table testing_mview_rev in 11g:

SQL> CREATE MATERIALIZED VIEW LOG ON testing_mview_rev WITH ROWID;

Materialized view log created.

And a MV on it in 10g:

SQL> create materialized view testing_mview_1_rev REFRESH Force start with (sysdate) next (sysdate+1/1440) with rowid as select * from testing_mview_rev@S58_TO_S56;
Materialized view created.

Now this is suppose to automatically refresh itself every minute but refresh is failing. However manual refresh is working fine.

what I have missed here. is there any other way to schedule the MV to run every minute?

View 13 Replies View Related

Drop Or Disable A Scheduled Job

Oct 11, 2012

I have a job running under HUMADM user and would like disable or drop it.I do not have the login credentials of HUMADM user but can log into the database as system/sys user.

When I run the below commands as sys/system user it says humadmjob must be a job or it is not running.This is because it is looking for the job under sys/system user.

exec DBMS_SCHEDULER.drop_job (job_name => 'humadmjob');
exec DBMS_SCHEDULER.stop_job (job_name => 'humadmjob');

SELECT owner, job_name, job_class, enabled FROM dba_scheduler_jobs;

OWNER     JOB_NAME     JOB_CLASS      ENABLED
====== ========= ======= ======
HUMADM     HUMADMJOB     DEFAULT_JOB_CLASS     TRUE

how to stop/disable this job? My oracle version is Oracle Database 10g Enterprise Edition Release 10.2.0.2.0 - 64bi

View 8 Replies View Related

SQL & PL/SQL :: Scheduled Jobs - Not Working?

Jun 22, 2010

am facing an issue with scheduled jobs. The below script will create a scheduled job to insert a record for every 2 mins into the table "job_table".

--Table script
CREATE TABLE job_table (now DATE);
--Stored procedure run by scheduled job
CREATE OR REPLACE PROCEDURE test1 IS
BEGIN

[code]...

The scheduled job does not require any special grant privillege as the PUBLIC has access to run it. Anyhow the same set of instruction working for my friend on his machine but not on my environment.

View 12 Replies View Related

PL/SQL :: How To Run A Scheduler Using Scheduled Time

Jun 5, 2013

-- Scheduler details

BEGIN
dbms_scheduler.create_schedule( 
schedule_name  => 'INTERVAL_EVERY_1_MINUTES', 
start_date    => trunc(sysdate)+18/24, 
repeat_interval => 'freq=MINUTELY;interval=1', 
comments     => 'Runtime: Every day all 1 minutes'); 
END;-- program code
BEGIN     

[code]....

all above three code compiled successfully . but it is not running automatically and not run every 1 minute.

I try to run this manuall by using following code

BEGIN
dbms_scheduler.run_job('JOB_FEED_UK_DATA',TRUE);
END;

It works fine..

create or replace
PROCEDURE LOAD_CUSTOMERS_UK
IS
BEGIN
  Insert into CUSTOMERS_UK (ID, NAME, CITY)  VALUES (1,'SMITH','LONDON');
  Insert into CUSTOMERS_UK (ID, NAME, CITY)  VALUES (2,'JONES','LONDON');
  Insert into CUSTOMERS_UK (ID, NAME, CITY)  VALUES (3,'BROWN','BRIGHTON');

[code]....

View 12 Replies View Related

RMAN Scheduled Database Backup

Oct 24, 2012

I have a 11.2.0.1 database windows 2008 server. I have RMAN with nocatalog. I need to take daily RMAN backup of database at 6 PM.

I want to schedule this RMAN backup to run automatically. I want to run this backup when I am not logged on.

View 2 Replies View Related

SQL & PL/SQL :: Program Automating Scheduled Jobs?

Jun 26, 2011

We are using one application. This application is having 2types of jobs. Under each job again there are each 5 sub jobs. All the jobs are scheduled jobs. Now the requirement is The main 2 jobs we are going to run on some specified days( for this we need to mention on what days we want to run.once we gave those day the next steps will start).

for example 1 main job is scheduled on Monday ( we need to schedule it on monday-- we need to write a program for this) under this every sub job will run.these sub jobs are dependent jobs.if sub job completed successfully it should send an email to the distributed mail group which says like " <Job_name> completed successfully" if it fails also it needs to send an email to the distributed group. for each sub job it should send either success/falure mail to the distriuted mail group.

once after completing all the sub jobs successfully it should send a mail to the distributed mail group saying that The main job got completed successfully.these two main jobs will run paralelly but the the second main job will run after 30 mins of 1st job starts.

in the second job also will work as same as job1 process.it should also send mails to the distributed mail groups.The jobs are already scheduled.No need to scheduled the jobs.need to write a pl/sql program like it will check all the jobs and respected sub jobs if any thing got completed/failed it should send an email to the distributed mail group automatically. For that it should monitor all the jobs..that's the requirement.

I have already scheduled all the jobs. now want to write a script for the above requiement.

View 3 Replies View Related

SQL & PL/SQL :: Disable Jobs Scheduled By User

Sep 13, 2010

changing the user for a job.

There are 2 jobs which are scheduled in database by a user XX.
Now I need to make these scheduled jobs run by user YY.

In order to do this do I need to disable the jobs scheduled by XX and then create same jobs as before under the new user YY.

View 9 Replies View Related

Windows :: Scheduled Tasks For Export Table

May 17, 2011

i have batch file name exptab,to export all table in database

for example
@echo off
exp scott/tigger tables=emp file=C:impemp.dmp LOG =C:implog1
batch file working fine when i click on it,

I need to use the Scheduled Tasks in windows 2003 so when the computer startup batch file will run automatically i follow all the step but its not working i try the same story with windows xp still problem exist .

View 6 Replies View Related

Windows :: Scheduled Removing Of Trm And Trn Files From Dump Area

Sep 19, 2011

As I was observing the space issues on my db server. I found that there is lots of Trm and Trc file which is being created very much frequently. Due to this its consuming lots of space even the size of each files is not more than 1Mb.

For cleaning I am deleting all the trm and trc files mannully using DEL command Os level. How can i schedule the purging of trm and trc files.

View 3 Replies View Related

Server Administration :: Find Last Run Duration Of Job Which Was Scheduled Using DBMS_JOB

Jun 20, 2010

Is there any way to find the last run duration of a job which was scheduled using DBMS_JOB?

View 3 Replies View Related

Performance Tuning :: Snapshot Skipped In Between Scheduled Time?

Sep 11, 2013

Yesterday, there were performance issue at server. So today, when i am generating report for that particular period, found snapshot id sequence is serially but with skipped hourly timed. Instead of generating report at 15:30, it generated at 16:30.

Enter value for num_days: 2

Listing the last 2 days of Completed Snapshots
Snap
Instance DB Name Snap Id Snap Started Level
------------ ------------ --------- ------------------ -----
tagidev TAGIDEV 2857 10 Sep 2013 00:30 1
2858 10 Sep 2013 01:30 1
2859 10 Sep 2013 02:30 1
2860 10 Sep 2013 03:30 1
2861 10 Sep 2013 04:30 1
2862 10 Sep 2013 05:31 1

[code]....

Below are the details at alert log -

Tue Sep 10 14:28:20 2013
Thread 1 cannot allocate new log, sequence 7029
Checkpoint not complete
Current log# 2 seq# 7028 mem# 0: E:APPORACLEORADATATAGIDEVREDO02.LOG
Thread 1 advanced to log sequence 7029 (LGWR switch)

[code]....

1) why snap didn't started at 15:30?

2) since database just started at the scheduled time of AWR snap time. But generated at 16:32 instead of 16:30, though last services "SMCO" is started at 16:42. How it snap id generated for this particular time?

3) what does "kewastUnPackStats(): bad magic 1 (0x000000001B3CE48D, 0)" mean?

View 7 Replies View Related

Scheduler :: How To Remove A Created Job And Stop / Change A Scheduled Job

Jan 7, 2013

I copied a sqlplus scheduled job procedure. Procedure successfully created .I fount it here [How to Schedule RMAN Daily Backup? [URL]

The procedure is successfully created. Now, doing the following operations:

1) running that job
2) checking whether that job is running or not
3) listing all other jobs
4) unschedule a scheduled job
5) delete a job
6) edit a job

View 3 Replies View Related

SQL & PL/SQL :: How To Schedule A Job From 8 Am To 8 Pm

Aug 30, 2013

I want to create a scheduler which should run from 8 am to 8 pm and every half an hour.How to do that. I tried dbms_scheduler because my procedure accepts two parameters.

DBMS_SCHEDULER.CREATE_SCHEDULE (
schedule_name => 'in_program_schedule',
start_date => trunc(sysdate)+(1/3),-- it is not taking
repeat_interval => 'freq=minutely; interval=30; bysecond=0;',
END_DATE => trunc(sysdate)+(5/6),-- it is not taking
comments => 'Repeats every half an hour');

View 8 Replies View Related

Server Administration :: Utilize Temp Tables As Part Of A Scheduled Job?

Jan 18, 2013

There is a readonly user on our reporting server. Developers want to use global temporary tables with this user. I don't want the user to have permissions other than readonly.I can grant the user CREATE TABLE privilege and did not grant quota on any permanent tablespace, therefore user would not be unable to create permanent tables but still should be able to create global temporary tables.

Question is would a user with such permissions still be able to utilize temp tables as part of a scheduled job?

View 2 Replies View Related

SQL & PL/SQL :: How To Schedule Job To Run Every Sunday At 12 Pm IST

Jun 11, 2013

I want to schedule a job which will run evry Sunday at 12 P.M IST.I have written the below script.

BEGIN
SYS.DBMS_SCHEDULER.CREATE_JOB
(
job_name => 'SERVICE_SAL_FS.SAL_MESSAGE_BUFFER_PURGE_JOB'
,start_date => SYSTIMESTAMP

[code]...

But the server in US.

SELECT sysdate from Dual;
6/11/2013 3:58:58 AM
--But the time in India is 02:28 PM

How to convert the timezone to IST. how to schedule the job to run evry Sunday at 12 P.M IST.

View 4 Replies View Related

SQL & PL/SQL :: How To Schedule Jobs

Dec 19, 2011

I want to run a procedure every day at 9 AM ,so how can i schedule it.

View 3 Replies View Related

How To Schedule A Job Chain

Mar 26, 2013

i want to schedule a job chain. I 've created 4 chain steps. The first perform an action and the second must be executed only if the first completed successfully.
The third must be executed only if the second ends successfully, etc.

The Chain_rule_2 is
CHAIN_STEP_1 Completed and CHAIN_STEP_1 SUCCEEDED
The chain_rule_3 is
CHAIN_STEP_2 Completed and CHAIN_STEP_2 SUCCEEDED
...
But the job is actually running because there isn't an end steps (I suppose). End step must be done if all steps works fine or if only one failed.

View 3 Replies View Related

SQL & PL/SQL :: Schedule A Job Using DBMS_SCHEDULER?

Jan 31, 2013

I am trying to schedule a job using DBMS_SCHEDULER.

The job has to start on SATURDAY 12:00 midnight and should run every on SATURDAY 12:00 midnight.

Even if I create the job on MONDAY first it should start on coming sunday and following sundays.

But I am getting the below error.

ORA-27452: BEGIN APPS_GLOBAL.POPULATE_TARGET144('APPS_XX','APPS_BE',5959); end; is an invalid name for a database object.
ORA-06512: at "SYS.DBMS_ISCHED", line 124
ORA-06512: at "SYS.DBMS_SCHEDULER", line 271
ORA-06512: at line 2

The Job script is

BEGIN
DBMS_SCHEDULER.create_job (
job_name => 'TEST_RAM',
job_type => 'STORED_PROCEDURE',
job_action => 'BEGIN APPS_GLOBAL.POPULATE_TARGET144(''APPS_XX'',''APPS_BE'',5959); END;',

[code]......

View 6 Replies View Related

SQL & PL/SQL :: Schedule Procedure On Oracle 10g?

Apr 11, 2012

If I have a sql file containg 'EXECUTE Proc_Test' i.e or any other procedure then to call that sql file what I will mention in the job_type.

OR

If the sql file contains a procedure and I want to call that file through scheduler then what I need to mention in the job type.

View 1 Replies View Related

SQL & PL/SQL :: Time Interval In Schedule Job

Jul 17, 2012

How to set time interval in schedule job i need five minutes interval..

View 5 Replies View Related

SQL & PL/SQL :: Create A Schedule Using Dbms_scheduler

Mar 13, 2011

I have create a schedule using dbms_scheduler and the problem is its not running on exact time that is start time , i even changed the attribute as following but its not.Its running using dbms_scheduler.run_job(veh_insp) when run directly.The schedule is as follows.

BEGIN
DBMS_SCHEDULER.SET_ATTRIBUTE(
name => 'INTERVAL_DAILY_2000',
attribute => 'start_date',
value => TRUNC(SYSDATE)+9.50/24);
END;

View 6 Replies View Related

SQL & PL/SQL :: Job Schedule To Run Every Wednesday In 20 Min Interval

Aug 5, 2010

schedule the dbms_job to run every Wednesday in 20min interval. I am using below script but getting error

exec dbms_job.isubmit(44,'ER2.LOAD_CRID2_DATA;',trunc(sysdate),'trunc(SYSDATE,''WEDNESDAY'') + 20/1440),TRUE);

View 5 Replies View Related

SQL & PL/SQL :: Repeat_interval In Oracle Schedule

Mar 18, 2013

How to set a Schedule or run a Job where repeat_interval should be null.

Like Below

DECLARE
-- Create jobs.
M_PROC varchar2(4000);
P_POL_SYS_ID NUMBER;
P_POL_END_NO_IDX NUMBER;
P_POL_END_SR_NO NUMBER;
JOB_NO NUMBER;
[code].......

I am running now then Job is not getting created and not able to see it in SELECT * FROM dba_scheduler_jobs;

View 6 Replies View Related

Scheduler :: Schedule A Procedure In Oracle

Sep 22, 2012

OS:Windows Server 2008
Database:Oracle 11gR2

I want to schedule a procedure in oracle and not from the Tash scheduler utility.Is there any way to schedule the procedure at database level.I want to run the procedure daily at specific time.

View 2 Replies View Related

Unable To Schedule MMON Slave - Error 100?

Feb 28, 2011

We have recently upgraded the database from Oracle 9i(9.2.0.8) to Oracle 11g (11.1.0.7).our environment:OS - AIX 5.3, application - COBOL server express 5.1-front end, which means cobol programs having embedded SQL connecting to Oracle database.

When executing programs, the a file with name "dbname_mmon_84444.trc" got generated in the "/trace" path with below message.

Unable to schedule a MMON slave at: Auto Flush Main 1
Slave was not permitted to be scheduled
- A slave for this action is already running.

ktte_monitor_ts: unable to schedule MMON Slave, error 100
ktte_monitor_ts: unable to schedule MMON Slave, error 100

View 1 Replies View Related

Enterprise Manager :: How To Set A Schedule To Export Data

Dec 23, 2011

I need to create a new schedule to export schema every day for Oracle on Linux Server. I am using OEM, But in Job Schedule of Export Schedule I can not see the repeat option.

View 1 Replies View Related







Copyrights 2005-15 www.BigResource.com, All rights reserved