I copied a sqlplus scheduled job procedure. Procedure successfully created .I fount it here [How to Schedule RMAN Daily Backup? [URL]
The procedure is successfully created. Now, doing the following operations:
1) running that job 2) checking whether that job is running or not 3) listing all other jobs 4) unschedule a scheduled job 5) delete a job 6) edit a job
We have a scheduler chain that calls 2 scheduler programs.The chains are controlled by a scheduler job that has job_type as CHAIN.My challenge is how to add email notifications on the failure or success of the programs.
I know about this procedure DBMS_SCHEDULER.ADD_JOB_EMAIL_NOTIFICATION, but this is only applicable to jobs and not programs(i believe). Is there an alternative way to trigger off emails for scheduler programs ?
how to stop going to next record if it finds the last record. Because when i click my next button(it is the last record), i try to click my previous or first button but it won't go back, enter-query mode is the error message.
I'm trying to install additional Oracle products on my XP VM, but it is telling me to kill all running oracle products. It states that by running the Oracle utility: oradim80 or the Windows NT service Control Panel I can stop all of these services, but I cannot find either.
I have a form with multiple data block. When i want to query and go to next record then this displayed a message "Do you want save changes". But i would like to stop this message(i.e would not see the message) is it possible.
I have master detail datablocks. Master block is course and detail block is trainee. students can schedule their courses in a location at particular time.
lets assume student1 has scheduled course A1 in location LA1 from 9am to 12 pm. Now second student shouldn't be able to schedule same course at same time in same location. He can schedule at different time duration. or else same time duration but different location. Or same time, same location but different course.
so, what i did is, i wrote code in when-validate-record of trainee block to display a message saying " cannot schedule course.choose another time." if he try to insert same time duration or same location .
when i am trying to insert a record with time which is already scheduled and in same location, it displays the message but it is also saving the record. i don't want to save the record.
how should i do this? i tried to give ROLLBACK in this trigger but it doesn't accept. i tried pre-insert trigger also but it is also displaying message but saving the record
my code in when-validate-record is:
declare cursor c1 is select start_time,end_time,loc from trainee where cname=:course.cname; [code].......
How to pass parameter value to a procedure in schedule jobs ?
--procedure : create or replace procedure updating_temptable(empcode in varchar2) is begin update ts_employee_master mas set mas.last_accessed = sysdate where mas.employee_code = empcode; end;
--scheduler
begin sys.dbms_job.submit(job => :job, what => 'updating_temptable;', next_date => to_date('24-04-2012 00:30:00', 'dd-mm-yyyy hh24:mi:ss'), interval => 'TRUNC(SYSDATE)+1+30/1440'); commit; end; /
How to pass employee_code in the procedure[updating_temptable ] in dbms job scheduler ?
why the Scheduler is not sending out notifications for a job I am running.I set up a small job that calls a programm which references a stored procedure. The procedure executes a manual refresh of a materialized view.
I did set up the SMTP parameters EMAIL_SENDER and EMAIL_SERVER, restarted the instance afterwards and verified that the parameters are set by logging into the Enterprise Manager web console and looking at the page with the email server parameters.
I did verify that the job did actually start and complete successfully by checking the logs in ALL_SCHEDULER_JOB_RUN_DETAILS
I did verify that I actually do have the notifications activated by checking ALL_SCHEDULER_NOTIFICATIONS...There are notifications for all events (JOB_STARTED, JOB_COMPLETED, JOB_SUCCEEDED, JOB_FAILED, etc.) for my job
I also verified that the materialized view has actually been refreshed by checking in ALL_MVIEW_REFRESH_TIMES
I also verified that the email server I am using is sending out emails by sending a test email from the shell using the same sender and recipient addresses as I am using in the notification settings.What could the reason be for the scheduler not sending out emails?
My oracle version is 11.2.0.2 RAC RDBMS on RHEL 5.6.
At my standby site my physical standby database is on 4 node cluster with all 4 instances up. I need to disable 3,4 instances so that we want it to run on only 1,2 instances.To disable the instances do i need to stop apply(mrp) process. And the apply node is node 1.
We use AIX 6.1 and 10.2.0.4.0 - 64bit. When we create an Job it will be execute as OS User Oracle, but this is not wanted.The file permisions are set as described in Guide to External Jobs on 10g with dbms_scheduler e.g. scripts,batch files
BEGIN dbms_scheduler.create_schedule( schedule_name => 'INTERVAL_EVERY_1_MINUTES', start_date => trunc(sysdate)+18/24, repeat_interval => 'freq=MINUTELY;interval=1', comments => 'Runtime: Every day all 1 minutes'); END;-- program code BEGIN
[code]....
all above three code compiled successfully . but it is not running automatically and not run every 1 minute.
I try to run this manuall by using following code
BEGIN dbms_scheduler.run_job('JOB_FEED_UK_DATA',TRUE); END;
It works fine..
create or replace PROCEDURE LOAD_CUSTOMERS_UK IS BEGIN Insert into CUSTOMERS_UK (ID, NAME, CITY) VALUES (1,'SMITH','LONDON'); Insert into CUSTOMERS_UK (ID, NAME, CITY) VALUES (2,'JONES','LONDON'); Insert into CUSTOMERS_UK (ID, NAME, CITY) VALUES (3,'BROWN','BRIGHTON');
I have master detail block just consider Forms A as a master and Forms B as a Detail,when my cursor is in form A i try to save the record, it is saved Form A and putting Form B data as null, i have to put a validation to stop this activity, i have to inform the user "Provide values for form B text item",
I created a post block trigger in form A
Begin
If (:FORM-B.TEXT1 is null)l or( :FORM-B.TEXT2 is null) then Message( 'provide value for FORM-B'); Message( 'provide value for FORM-B'); raise form_trigger_failure; ELSE NULL; END IF END;
Im Getting error message and navigation got stopped in last item of form A itself,i need to show error message and cursor control should move to first item of form -B which trigger i have to use for this.
I'd like to stop Recovery in specific time. For instance ; My db works Day-1 and Every day Recovery starts 20:00 and finish 05:00. If it is possible that when DB time reach to sync 03:00, I'd like to stop recovery.
I'm uploading data from excel to our database using forms thru webutil. The problem is when I open the same excel file while the upload process is in progress, the uploading stops, BUT not displaying any error. Not even when I chick Help->Show error.
How could I prevent this error and how to trap and display error message?
i want to stop log shipping to standby database. the whole configuration was done by someone else and now i have been ask to stop it. it is done on test bases and now want to stop it.what i have got from internet is as follows:
Alter system set log_archive_dest_2='DEFER'; and i have got the fol error ORA-32107:failure in updating spfile ORA-16179:Incremental changes to "Log_archive_dest_2" not allowed
I am having a problem getting to run an Oracle file watcher job successfully. The file watcher starts on schedule and I can see the entries in the DBA_ SCHEDULER_JOB_RUN_DETAILS table. However, I see a status of FAILED with an error 1024. Under additional information I get the following 2 Oracle errors:
ORA-01024: invalid datatype in OCI call ORA-21560: argument 7 is null, invalid, or out of range
The job is trying to start a stored procedure with one input parameter and signature: PROCEDURE SP_HFU_NTS_FILE_WATCHER_ACTION (p_sfwr SYS.SCHEDULER_FILEWATCHER_RESULT).
I have to fire "EXPORT BACKUP COMMAND" depend on the EOD Process.
ie:
1) We have a EOD Process, which would be completing between 8pm to 6am. 2) After this EOD process, we have to take EXPORT Backup. 3) The above mentioned steps are being done manually.
Now i want to make them automated:
4) ie if the EOD process completed between the mentioned time. then Export command should be run, otherwise should not happen.