Forms :: How To Stop Going To Next Record If It Is Last One
Jan 31, 2012
how to stop going to next record if it finds the last record. Because when i click my next button(it is the last record), i try to click my previous or first button but it won't go back, enter-query mode is the error message.
View 9 Replies
ADVERTISEMENT
Feb 5, 2011
I have master detail block just consider Forms A as a master and Forms B as a Detail,when my cursor is in form A i try to save the record, it is saved Form A and putting Form B data as null, i have to put a validation to stop this activity, i have to inform the user "Provide values for form B text item",
I created a post block trigger in form A
Begin
If (:FORM-B.TEXT1 is null)l or( :FORM-B.TEXT2 is null)
then
Message( 'provide value for FORM-B');
Message( 'provide value for FORM-B');
raise form_trigger_failure;
ELSE
NULL;
END IF
END;
Im Getting error message and navigation got stopped in last item of form A itself,i need to show error message and cursor control should move to first item of form -B which trigger i have to use for this.
View 1 Replies
View Related
May 25, 2011
SQLserver in stop condition when i play it. it again stop
View 1 Replies
View Related
Nov 3, 2010
I have a form with multiple data block. When i want to query and go to next record then this displayed a message "Do you want save changes". But i would like to stop this message(i.e would not see the message) is it possible.
View 3 Replies
View Related
Feb 7, 2010
I have master detail datablocks. Master block is course and detail block is trainee. students can schedule their courses in a location at particular time.
lets assume student1 has scheduled course A1 in location LA1 from 9am to 12 pm. Now second student shouldn't be able to schedule same course at same time in same location. He can schedule at different time duration. or else same time duration but different location. Or same time, same location but different course.
so, what i did is, i wrote code in when-validate-record of trainee block to display a message saying " cannot schedule course.choose another time." if he try to insert same time duration or same location .
when i am trying to insert a record with time which is already scheduled and in same location, it displays the message but it is also saving the record. i don't want to save the record.
how should i do this? i tried to give ROLLBACK in this trigger but it doesn't accept. i tried pre-insert trigger also but it is also displaying message but saving the record
my code in when-validate-record is:
declare
cursor c1 is
select start_time,end_time,loc
from trainee
where cname=:course.cname;
[code].......
View 5 Replies
View Related
Oct 21, 2010
I'm uploading data from excel to our database using forms thru webutil. The problem is when I open the same excel file while the upload process is in progress, the uploading stops, BUT not displaying any error. Not even when I chick Help->Show error.
How could I prevent this error and how to trap and display error message?
View 8 Replies
View Related
Feb 17, 2010
How Can We Stop to insert Data if Master Block have the record and detail block have no record but commit command applied i want that commit command can not be work if detail block have no record
View 7 Replies
View Related
Jul 29, 2010
I have problem with the form when i pass from the master to detail block the form stop working and it stops responding even if i am in the next detail block and i press tab to change from one record to another the form will say working and it stops responding.
View 2 Replies
View Related
Jul 26, 2012
My procedure proc_ex is in when_validate_item trigger
I have one Multi Record data block in my form with values in its items
I need to Populate multi record block values to one Record Group using
add_group_row,
add_group_column,
set_group_char_cell to populate values to record group
Let us suppose my multi record data block looks like
item1 item2 item3 item4
10 20 50 70
25 15 30 45
45 90 47 38
75 25 85 90
30 56 78 80
how to populate these multi record datablock values to Record Group ???..Eagerly waiting for your Replies
View 3 Replies
View Related
Sep 13, 2011
I have a fairly standard Purchase Order form which contains pre-loaded data (been uploaded from an XML file).When the Purchase Order is processed, the form updates a Price History table only if the Price on the PO_Details changes.The code for updating the price history table is contained in a PRE_UPDATE trigger on the PO_Details Data Block.
No other data changes on the PO_Details table.I now want to change this so that the Price History table is updated even if the price does not change i.e I want to create a history record for each record on the PO_Details irrespective of whether it was updated or not.
Is there an alternative trigger that I can move my code to (ie move it from PRE_UPDATE) to some other trigger that is fired for each PO_Details record even if there is no change.
View 4 Replies
View Related
Jun 29, 2013
I create a data block on a table when I am inserting new record only one record have been saved. Last record no longer exist.
View 4 Replies
View Related
Sep 10, 2012
I have one multi record block in that i have one LOV..If i choose lov in first record that won't be display in second record lov...
View 4 Replies
View Related
Dec 25, 2011
when a user change or delete any record or row in forms data automatically move to other table because i want to compare old and new record.
View 8 Replies
View Related
Jun 1, 2011
There is one maintenance job owned by SYSMAN running continuously. I want to stop that scheduler job .How ?
IS this the correct syntax to stop the running job ?
exec dbms_scheduler.stop_job(job_name=>'jobname');
View 1 Replies
View Related
Feb 3, 2007
I HAVE A FORM PLAYING SOUND WHEN IT'S OPENED AND WHEN I CALL ANOTHER FORM WITH SOUND ERROR "FRM-47201: Cannot play sound" -Unable to play the sound in the requested sound item. The sound output device may be busy. -SO I WONDER IF THERE IS ANY WAY TO STOP THE SOUND IN THE FIRST FORM WHEN ANY ACTION HAPPENED
View 8 Replies
View Related
Oct 8, 2013
I have a LOV in a custom oracle forms.this lov is linked to a record group.
Presently the column on which lov is created does not contain any value.
I want to insert value into the lov through the forms.
I am not able to insert data into it through forms
View 12 Replies
View Related
Jul 3, 2010
i want check some data from one process instead of last record
i.e
process data
uuu 1
2
3
4
ppp 1
2
3
4
[code].....
View 2 Replies
View Related
Apr 1, 2012
HOW TO STOP THE UPDATE IN PK COLUMN?
View 3 Replies
View Related
Apr 9, 2012
I'm trying to install additional Oracle products on my XP VM, but it is telling me to kill all running oracle products. It states that by running the Oracle utility: oradim80 or the Windows NT service Control Panel I can stop all of these services, but I cannot find either.
View 2 Replies
View Related
Aug 27, 2013
We are runing (Version: Application Express 4.1.1.00.23)I need to reboot the server.How do I stop APEX gracefully and start it back after?
View 8 Replies
View Related
Feb 7, 2007
Vehicle 1 Odometer OilLife Drop
18454 85.9% < 1st Oil Change keep
20000 35.9% keep
22781 21.5% keep
25911 89.4% < discard 2nd Oil Change keep
28598 74.1% < discard from data
32365 65.1% < discard from data
46000 45.4% < discard from data
49343 94.4% < discard 3rd Oil Change
Vehile 2 Odometer OilLife..
This shows a drop in oil life. I only want up until the FIRST Oil Change happened. So when the Oil Life drop goes up stop selecting data.
View 1 Replies
View Related
Jun 2, 2010
I am trying to create a trigger to stop events from being deleted if the date is before the current date. This is the SQL syntax for my table
CREATE TABLE event
(event_id numeric(5) not null,
concert_id numeric(5) not null,
event_date date,
);
What I have attempted so far is:
CREATE OR REPLACE TRIGGER event_deleting
BEFORE DELETE ON event
FOR EACH ROW
BEGIN
IF DELETING THEN
[code]......
This gives me a few warnings, the first is that a DECLARE is missing and the second is a INTO is missing.
View 1 Replies
View Related
Nov 13, 2011
How to stop all jobs(dbms_scheduler) when ever database down or power failure and I need to restart all jobs when ever database is up.
View 3 Replies
View Related
Jul 21, 2011
srvctl stop database d devdb1
After that i got this below status .how to make it up Steup by steup procedure
crs_stat -t
Name Type Target State Host
------------------------------------------------------------
ora.devdb.db application ONLINE ONLINE islr...v345
ora....b1.inst application ONLINE ONLINE islr...v333
ora....b2.inst application ONLINE ONLINE islr...v345
ora....dbap.cs application OFFLINE OFFLINE
[code]...
View 2 Replies
View Related
Aug 30, 2012
My oracle version is 11.2.0.2 RAC RDBMS on RHEL 5.6.
At my standby site my physical standby database is on 4 node cluster with all 4 instances up. I need to disable 3,4 instances so that we want it to run on only 1,2 instances.To disable the instances do i need to stop apply(mrp) process. And the apply node is node 1.
View 9 Replies
View Related
Apr 20, 2013
What is the hierarchy to stop and start oracle RAC instance ?
View 10 Replies
View Related
Jan 20, 2012
I need to add some kind of tracing in oracle 11g on linux when oracle starts and stops - as at times oracle takes a long time to start.
View 9 Replies
View Related
Nov 9, 2012
I'd like to stop Recovery in specific time. For instance ; My db works Day-1 and Every day Recovery starts 20:00 and finish 05:00. If it is possible that when DB time reach to sync 03:00, I'd like to stop recovery.
DB version Oracle 10.2.0.5 .....
View 5 Replies
View Related
Mar 29, 2012
i want to stop log shipping to standby database. the whole configuration was done by someone else and now i have been ask to stop it. it is done on test bases and now want to stop it.what i have got from internet is as follows:
Alter system set log_archive_dest_2='DEFER';
and i have got the fol error
ORA-32107:failure in updating spfile
ORA-16179:Incremental changes to "Log_archive_dest_2" not allowed
View 1 Replies
View Related
Jan 7, 2013
I copied a sqlplus scheduled job procedure. Procedure successfully created .I fount it here [How to Schedule RMAN Daily Backup? [URL]
The procedure is successfully created. Now, doing the following operations:
1) running that job
2) checking whether that job is running or not
3) listing all other jobs
4) unschedule a scheduled job
5) delete a job
6) edit a job
View 3 Replies
View Related