SQL & PL/SQL :: Generate Auto Email To Concerned User Like A Schedule Date?
Feb 26, 2011
I am maintaining vehicles information of our company in our equipment master table and there is one field where I am storing one date ( Vehicle inspection due date) based on this date I want to generate auto email to concerned user like a schedule date is due and he needs to prepare his car for inspection .
This schedule will run on everyday basis and it will generate the email to concerned persons two days before. how I can setup this in oracle using Scheduler.
I have a table in some db called retailer. I want to generate an email based trigger. What i want to achieve is as follows
I want to generate an email based trigger. What i want to do is that i should store the current retailer id which is until this point and then on each further insertions in retailer id i want that some trigger or script is running in background which is storing the retailer id. When the retailer id advances by 45 then a trigger should be generated saying that retailer id has advanced to 45 numbers from this date.
I've heard about diferent ways of generating email in response to a database event e.g
1 - Using UTL_MAIL package. OR 2 - Event Driven Reporting feature of 10g Database and using SRW.Run_Report package to generate and mail a report.
Now I'm confused that how should I accomplish the following tasks:
(i) - How to generate an email after Insert/Update/Delete on a table and acknowledge the concerned users about that event? (ii)- How to attach a text file with that email?
I'm attempting configure User-defined Metric to send mails when happen warning or critical alerts .My environment is Cluster Database and I'm using OEM Grid Control
I created User-defined Metric for monitoring invalid object for example and scheduled this collect to every 5 minutes.On initial OEM page, I see alert violation, but don't receive mail for this. In my Notification Rules page, I added "User-Defined Numeric Metric" and includes object Check_Invalid_Objects, wich is my UDM.I receive several alerts violations, but don't UDM.
UDM_Violation.png ( 116.68K ) Number of downloads: 0
NotificationRule.jpg ( 218.78K ) Number of downloads: 0
ScheduleNotification.jpg ( 373.64K ) Number of downloads: 0
i forget my system password and i can't login to my database,and its not letting me in as sys/manager as sysdba...how to generate new user and password....
Is there a way I can generate a list of date using a simple SELECT statement to generate all dates between to date points? For example between SYSDATE AND SYSDATE-7?
One way I know is have a table and run PL/SQL script to put all dates in it and query that but was wondering if it can be achieve via SQL SELECT query at all without creating a table (querying DUAL).
I have made one application form where users need to enter some data. This data is getting inserted in four tables. As in for now the data is properly getting saved and retrieved only for one user at a time. But problem arrives when more than one users are simultaneously making an entry and saving the data at one time.Same number is getting generated for the users who are saving the data at one time which should not happen.
I want to create a scheduler which should run from 8 am to 8 pm and every half an hour.How to do that. I tried dbms_scheduler because my procedure accepts two parameters.
DBMS_SCHEDULER.CREATE_SCHEDULE ( schedule_name => 'in_program_schedule', start_date => trunc(sysdate)+(1/3),-- it is not taking repeat_interval => 'freq=minutely; interval=30; bysecond=0;', END_DATE => trunc(sysdate)+(5/6),-- it is not taking comments => 'Repeats every half an hour');
i want to schedule a job chain. I 've created 4 chain steps. The first perform an action and the second must be executed only if the first completed successfully. The third must be executed only if the second ends successfully, etc.
The Chain_rule_2 is CHAIN_STEP_1 Completed and CHAIN_STEP_1 SUCCEEDED The chain_rule_3 is CHAIN_STEP_2 Completed and CHAIN_STEP_2 SUCCEEDED ... But the job is actually running because there isn't an end steps (I suppose). End step must be done if all steps works fine or if only one failed.
I am trying to schedule a job using DBMS_SCHEDULER.
The job has to start on SATURDAY 12:00 midnight and should run every on SATURDAY 12:00 midnight.
Even if I create the job on MONDAY first it should start on coming sunday and following sundays.
But I am getting the below error.
ORA-27452: BEGIN APPS_GLOBAL.POPULATE_TARGET144('APPS_XX','APPS_BE',5959); end; is an invalid name for a database object. ORA-06512: at "SYS.DBMS_ISCHED", line 124 ORA-06512: at "SYS.DBMS_SCHEDULER", line 271 ORA-06512: at line 2
I have set up two scheduled jobs in oracle 11g for executiong a procedure in specific time intervals. One as Hourly and other as minutely.But the scheduled jobs are not running as per schedule. i.e the minutely job is not running every minute. But If i see the run logs for some period it would have run every minute, and suddenly it will not execute and give a gap of 30 mins or 1 hour and then run again.
P.s. The job priority is set as 3. and except for these two jobs there are no other jobs set. But this is an important job which needs to be run every minute.
JOB_QUEUE_PROCESSES is set to 1000, which is max. And there are only 3 scheduled jobs in the whole DB. BEGIN SYS.DBMS_SCHEDULER.CREATE_JOB ( job_name => 'LOGTBLPURGE'
I have create a schedule using dbms_scheduler and the problem is its not running on exact time that is start time , i even changed the attribute as following but its not.Its running using dbms_scheduler.run_job(veh_insp) when run directly.The schedule is as follows.
BEGIN DBMS_SCHEDULER.SET_ATTRIBUTE( name => 'INTERVAL_DAILY_2000', attribute => 'start_date', value => TRUNC(SYSDATE)+9.50/24); END;
I want to schedule a procedure in oracle and not from the Tash scheduler utility.Is there any way to schedule the procedure at database level.I want to run the procedure daily at specific time.
We have recently upgraded the database from Oracle 9i(9.2.0.8) to Oracle 11g (11.1.0.7).our environment:OS - AIX 5.3, application - COBOL server express 5.1-front end, which means cobol programs having embedded SQL connecting to Oracle database.
When executing programs, the a file with name "dbname_mmon_84444.trc" got generated in the "/trace" path with below message.
Unable to schedule a MMON slave at: Auto Flush Main 1 Slave was not permitted to be scheduled - A slave for this action is already running.
ktte_monitor_ts: unable to schedule MMON Slave, error 100 ktte_monitor_ts: unable to schedule MMON Slave, error 100
I migrate schema with data from oracle 10gR2(Windows) to oracle RAC 11gR2 (Linux).My JOBS are created but they are not running on defined schedule. but they run manually successful.
----script of my job are as below --------
BEGIN SYS.DBMS_SCHEDULER.DROP_JOB (job_name => 'JHON.TAX_IT); END; / [code]...
I need to create a new schedule to export schema every day for Oracle on Linux Server. I am using OEM, But in Job Schedule of Export Schedule I can not see the repeat option.
how made a success of insert data into table temporary in job_schedule ? because when i tried to change insert into table permanent always successfully.
CREATE GLOBAL TEMPORARY TABLE YG_PAYMENT_TMP ( SITE_CODE VARCHAR2(100 BYTE), KBON VARCHAR2(100 BYTE), FUTURE_DATE DATE
[code]...
why insert into table temporary not successfully in job_submit.