How to pass parameter value to a procedure in schedule jobs ?
--procedure : create or replace procedure updating_temptable(empcode in varchar2) is begin update ts_employee_master mas set mas.last_accessed = sysdate where mas.employee_code = empcode; end;
--scheduler
begin sys.dbms_job.submit(job => :job, what => 'updating_temptable;', next_date => to_date('24-04-2012 00:30:00', 'dd-mm-yyyy hh24:mi:ss'), interval => 'TRUNC(SYSDATE)+1+30/1440'); commit; end; /
How to pass employee_code in the procedure[updating_temptable ] in dbms job scheduler ?
I saw bunch of other posts but I could find the post that exactly explaining about where the value returned as systimestamp / sysdate comes from or impacted Here is my situation I have an access to this db (let me call db A) and when I access it, I get following result. I don’t have full access to this db so I cannot experiment a lot here.
I’m in PST timezone.I have my db which I have full access as well as its host.I can make result like db A on my db if I started up db and its listener while TZ environment variable equal to UTC.Now I saw in other post that someone was trying to retrieve systimestamp value in a job executed via dbms_scheduler.run_job.
So I did that in two ways. 1 with use_current_session = true and 2 is false for the same.On my db, results are the same (both returns time in UTC) but on db A, I got UTC time when use_current_session = true and PST when use_current_session = false.
So questions are: What could be the difference in setup between my db and db A? Is there a query, logfile, or anything I should check to find out what can be the difference?
I tried to find the cause with my db and I could see the same result as db A which is to see UTC time if use_current_session = true and PST time if use_current_session = false by bringing up the db listener after I set TZ environment variable equal to PST8PDT. However this causes systimestamp from sqlplus session become also a PST time.
The reason I’m playing around with the setup and checking systimestamp value is because we are facing the situation where everywhere except pl/sql job submitted by enterprise scheduler service is pointing wrong timezone (PST instead of UTC)
I've written a chain with four programs. The third program is depend on the output of the second. However the third program finishes before the second. How do I wait for the second to finish.
How to create DBMS_SCHEDULER job for particular instance,we have 3 instance we want to schedule few jobs in Instance 2,how to schedule in Particular instance.
I studied the documentation and many websites about DBMS_JOB but I am still confused.How do I schedule a procedure to run i.e. every sunday 10:00 AM ?This is what I tried:
DECLARE X NUMBER; BEGIN SYS.DBMS_JOB.SUBMIT ( job => X
I'm using Oracle DB 10g EE 10.2.0.3.0 I have created a program to be executed with scheduler. however when I execute the job it fails due to a permissions error.
BEGIN DBMS_SCHEDULER.CREATE_PROGRAM ( program_name => 'Billing_files_organise_prog', program_action => '/home/ora10/data/organise.sh',
I have scheduled few jobs (scheduled for each day) which has not run today, which was running successfully till yesterday. When I query dba_scheduler_jobs, i could see last_run_date as yesterday's date 6am and next_run_date is still showing today's date and time (it should show tomorrow's date/time).
When performing test recoveries of a database we often wish to prevent database jobs from running application processes such as (a) sending emails; or (b) logging events to a central logging database. In order to accomplish this, we set the job_queue_processes to zero before opening the database.
This means that no dbms_jobs run on the open instance, but it does not prevent dbms_scheduler jobs from running.How can we prevent any dbms_scheduler jobs from running?
I have looked at setting the MAX_JOB_SLAVE_PROCESSES attribute using DBMS_SCHEDULER.SET_SCHEDULER_ATTRIBUTE, but this cannot be set to zero.
we are facing an issue with the dbms scheduler jobs, which is not processing the synonym which is created via dblink from anthoer schema.
Let me explain the situation.
Table in Schema :APP_COMMON DB: APPL -------------------------------------
CREATE TABLE TEST_LOG (A VARCHAR2(10));
INSERT TEST_LOG VALUES ('TESTED');
GRANT SELECT ON TEST_LOG to APP_GEN ;
Table in Schema :APP_GEN DB: APPL -------------------------------------
CREATE SYNONYM TEST_LOG FOR APP_COMMON.TEST_LOG;
SELECT * from TEST_LOG;
-- it returns the value
Table in Schema :APP_GEN DB: REPORT -------------------------------------
This is the different DB (we have 2 DB's, one for report db and one for application DB). here we create the DB link (connected DB menthod) . Since we have the password sync between the databases, we create the DBLINK without user id and password.
CREATE DATABASE LINK "APPL_LINK" USING 'APPL' ;
CREATE SYNONYM TEST_LOG FOR TEST_LOG@APPL_LINK;
SELECT * from TEST_LOG; --it returns the value.
Now in the same DB, we have a scheduler which will run for every min.
Now Scheduler is not selecting this table. Rather not processing the synonym(TEST_LOG). Not able to capture the exception also.
I have successfully installed Oracle DBMS 11g R2 on Windows 7 64-bit Ultimate. I can only access the EM using only one user which SYSTEM. Although, I created different users which are unlocked but no success in accessing the EM even with the user name 'SYS'.
We have a scheduler chain that calls 2 scheduler programs.The chains are controlled by a scheduler job that has job_type as CHAIN.My challenge is how to add email notifications on the failure or success of the programs.
I know about this procedure DBMS_SCHEDULER.ADD_JOB_EMAIL_NOTIFICATION, but this is only applicable to jobs and not programs(i believe). Is there an alternative way to trigger off emails for scheduler programs ?
I am trying to redefine a table as to get clear of the thousands of chained and migrated rows. The darn table contains a lob column.I am trying to complete the process with the dbms_redefinition package.
I've createad the temporary table with all option to nologging. I've started the redefinition at midnight and it not yet completed and I can't find why it is taking so long. I've done the process with a table, similar in size in a Dev environement and it took at most two hours. In production, the process has been going on for 10h30 now.
I can see my tablespace size increase from time to time and when I querry the dba_segments to find out the size of both tables my temporary table is now 4 times the size of the original table.
I want to schedule a procedure in oracle and not from the Tash scheduler utility.Is there any way to schedule the procedure at database level.I want to run the procedure daily at specific time.
Why Oracle shceduler is not running.What could be the cause.
CREATE TABLE dept1 AS SELECT * FROM dept; CREATE OR REPLACE procedure update_record(p_deptno number)is BEGIN insert into dept1 values(p_deptno,'xxx','xxx'); end;
I want to create a schedule as below. But it shows error message which i cant understand.
begin DBMS_SCHEDULER.CREATE_jOB( job_name => 'Alert_monitor',
[Code]....
Here is the error message.
Error at line 1 ORA-06550: line 2, column 1: PLS-00306: wrong number or types of arguments in call to 'CREATE_JOB' ORA-06550: line 2, column 1: PL/SQL: Statement ignored
We have a .NET application on windows server 2008 32bit using the stored procedures on an Oracle 10g environment. We are trying to deploy the .NET application onto a 64bit x86 Windows server 2008.
We face an error trying to install the x64 version of the Oracle 10g client on windows 2008. The error we get is Problem signature:
Problem Event Name: APPCRASH Application Name: javaw.exe
Is the x64 version of the Oracle 10g client certified for Windows 2008? Has anyone successfully installed the 64bit version of the oracle client on win2008?
We have a workaround in place with 32 bit version of the client running with the 32 bit version of the .NET application on x64 win2008. However to maximize the infrastructure we need to use the 64 bit version or we would have to turn to MSSQL Server .
Database: oracle 9i sitting on a 32 bit machine. Client: windows7 64 bit computer installed oracle 11gr2 client
Is there a way to connect to oracle 9i database from C:WindowsSysWow64odbcad32.exe on windows 7 machine? or what is the possible way to connect to Oracle 9i database?What we need is to run crystal reports from windows 7.
I am begginer programing oracle and I have a issue to resolve but I can't resolve it.I have a procedure that upload a image from a directory. But when I pass the path, the function bfilename put a slash "/" in the path. I don't know why.Here my code.
CREATE OR REPLACE PROCEDURE p_grava_assinatura_gestor AS --------------------------------------------------------- -- Crio o Cursor dos Nomes dos Arquivos JPG. -- --------------------------------------------------------- CURSOR cursor_nome_arquivo IS SELECT p.id, (p.empresa || '_' || p.chapa || '.JPG') AS noarq
CREATE or replace PROCEDURE table_demo (tabname IN varchar2) IS cursor_name INTEGER; rows_processed INTEGER;
[code]...
There are no compilation errors.I call this code from the following anonymous block...
DECLARE X CHAR:='T'; BEGIN TABLE_DEMO(X); END;
This also compiles successfully and without any errors. It runs properly as wellHowever when I run 'select * from T'. Then system throws up the error of table or view does not exist.
there are 4 jobs scheduled in oracle dbms_job. 3 jobs will run everyday at 4.00AM. 1 job will run at every hour.Daily jobs are running fine. But hourly job is not executing automatically. If forced (exec dbms_job.run(<enter here job number>), this execute fine.
job_queue_processes=5 total jobs in schema=2503 total jobs in db = 2614
Even there are many jobs scheduled, next_date for 2234 jobs are lesser than the sysdate. Again in 269(2503-2234) jobs, 2265 are having NULL in the interval column.
Database 2(sm02): ============= oracle, 9.2.0.6
there are 4 jobs scheduled in oracle dbms_job. 3 jobs will run everyday at 4.00AM. 1 job will run at every hour.All the jobs are not running automatically. If forced (exec dbms_job.run(<enter here job number>), these execute fine.
job_queue_processes=5 total jobs in schema=7 total jobs in db = 7
I planning to follow the below steps to avoid the above issue.
1.) Restart the job queue process by executing alter system set job_queue_processes=0
2.) Increase the value for the job_queue_processes.
3.) Restart the database
But I got stuck in the 2nd step. what value I need to put for this job_queue_processes parameter?