Dbms Job Is Not Executing Automatically
Aug 11, 2011
Database 1(sm01):
=============
oracle, 9.2.0.6
there are 4 jobs scheduled in oracle dbms_job. 3 jobs will run everyday at 4.00AM. 1 job will run at every hour.Daily jobs are running fine. But hourly job is not executing automatically. If forced (exec dbms_job.run(<enter here job number>), this execute fine.
job_queue_processes=5
total jobs in schema=2503
total jobs in db = 2614
Even there are many jobs scheduled, next_date for 2234 jobs are lesser than the sysdate. Again in 269(2503-2234) jobs, 2265 are having NULL in the interval column.
Database 2(sm02):
=============
oracle, 9.2.0.6
there are 4 jobs scheduled in oracle dbms_job. 3 jobs will run everyday at 4.00AM. 1 job will run at every hour.All the jobs are not running automatically. If forced (exec dbms_job.run(<enter here job number>), these execute fine.
job_queue_processes=5
total jobs in schema=7
total jobs in db = 7
I planning to follow the below steps to avoid the above issue.
1.) Restart the job queue process by executing alter system set job_queue_processes=0
2.) Increase the value for the job_queue_processes.
3.) Restart the database
But I got stuck in the 2nd step. what value I need to put for this job_queue_processes parameter?
View 2 Replies
ADVERTISEMENT
Jul 18, 2013
I'm using Oracle DB 10g EE 10.2.0.3.0 I have created a program to be executed with scheduler. however when I execute the job it fails due to a permissions error.
BEGIN
DBMS_SCHEDULER.CREATE_PROGRAM (
program_name => 'Billing_files_organise_prog',
program_action => '/home/ora10/data/organise.sh',
[code]...
View 1 Replies
View Related
Apr 14, 2011
I am calling one procedure through job and after submitting the job i am using commit. problem is when job close the session it commit the code which is inside procedure and as per my understanding in another session also, which i want to avoid .
my procedure is
Create My_proc is
Begin
Insert into my_table values(1,2,3);
End;
And my job proc is
Create my_job_proc is
Begin
dbms_job.submit(jobno,'my_proc;',sysdate,null,null,false);
commit;
End;
now i am calling my job proc is
Declare
Begin
my_job_proc;
End;
Now problem is once it finish, it will insert the data into my_table which i don't want until I call Commit.I already try 'Set autocommit off'
View 9 Replies
View Related
Apr 23, 2012
How to pass parameter value to a procedure in schedule jobs ?
--procedure :
create or replace procedure updating_temptable(empcode in varchar2) is
begin
update ts_employee_master mas
set mas.last_accessed = sysdate
where mas.employee_code = empcode;
end;
--scheduler
begin
sys.dbms_job.submit(job => :job,
what => 'updating_temptable;',
next_date => to_date('24-04-2012 00:30:00', 'dd-mm-yyyy hh24:mi:ss'),
interval => 'TRUNC(SYSDATE)+1+30/1440');
commit;
end;
/
How to pass employee_code in the procedure[updating_temptable ] in dbms job scheduler ?
View 5 Replies
View Related
Mar 6, 2013
I am begginer programing oracle and I have a issue to resolve but I can't resolve it.I have a procedure that upload a image from a directory. But when I pass the path, the function bfilename put a slash "/" in the path. I don't know why.Here my code.
CREATE OR REPLACE PROCEDURE p_grava_assinatura_gestor AS
---------------------------------------------------------
-- Crio o Cursor dos Nomes dos Arquivos JPG. --
---------------------------------------------------------
CURSOR cursor_nome_arquivo IS
SELECT p.id, (p.empresa || '_' || p.chapa || '.JPG') AS noarq
[code]...
View 9 Replies
View Related
Oct 29, 2010
I am trying to redefine a table as to get clear of the thousands of chained and migrated rows. The darn table contains a lob column.I am trying to complete the process with the dbms_redefinition package.
I've createad the temporary table with all option to nologging. I've started the redefinition at midnight and it not yet completed and I can't find why it is taking so long. I've done the process with a table, similar in size in a Dev environement and it took at most two hours. In production, the process has been going on for 10h30 now.
I can see my tablespace size increase from time to time and when I querry the dba_segments to find out the size of both tables my temporary table is now 4 times the size of the original table.
View 7 Replies
View Related
Oct 7, 2010
I am creating the following dbms_sql procedure...
CREATE or replace PROCEDURE table_demo
(tabname IN varchar2)
IS
cursor_name INTEGER;
rows_processed INTEGER;
[code]...
There are no compilation errors.I call this code from the following anonymous block...
DECLARE
X CHAR:='T';
BEGIN
TABLE_DEMO(X);
END;
This also compiles successfully and without any errors. It runs properly as wellHowever when I run 'select * from T'. Then system throws up the error of table or view does not exist.
View 12 Replies
View Related
Sep 24, 2012
SET serveroutput on size 1000000
SET wrap on
SET linesize 80
DECLARE
v_text VARCHAR2 (4000);
v_res NUMBER;
v_num NUMBER;
[code]...
View 6 Replies
View Related
Sep 7, 2010
Under what userid(privileges) does a scheduled DBMS Jos run, is it under the same user that scheduled the job?
Does oracle internally log in(opens a new session) in order to run a scheduled DBMS Job?
some reference websites where I can get some details about how the scheduled jobs are executed?
View 2 Replies
View Related
May 18, 2010
I'm currently busy with database consolidation, so I'm searching for a solution to generate some useful DDL to prepare the new target database before importing the application's data. This should include TABLESPACE DDL and all additional users with their grants.
So first I thought of developing a simple script, which will create the CREATE TABLESPACE DDL but with transformed datafile paths.But my throws some errors and I don't understand why:
ORA-31604: invalid NAME parameter "STORAGE" for object type TABLESPACE in function SET_FILTER
declare
l_hObject NUMBER;
l_Objddl CLOB;
[code]...
View 7 Replies
View Related
Mar 27, 2013
I saw bunch of other posts but I could find the post that exactly explaining about where the value returned as systimestamp / sysdate comes from or impacted Here is my situation I have an access to this db (let me call db A) and when I access it, I get following result. I don’t have full access to this db so I cannot experiment a lot here.
SYSTIMESTAMP CURRENT_TIMESTAMP LOCALTIMESTAMP DBTIMEZONE SESSIONTIMEZONE
--------------------------------------------------------- --------------------------------------------------------- ------------------------------------------------ --------------------- ----------------------------
27-MAR-13 02.31.55.041411 AM +00:00 26-MAR-13 07.31.55.041416 PM -07:00 26-MAR-13 07.31.55.041416 PM +00:00 -07:00
I’m in PST timezone.I have my db which I have full access as well as its host.I can make result like db A on my db if I started up db and its listener while TZ environment variable equal to UTC.Now I saw in other post that someone was trying to retrieve systimestamp value in a job executed via dbms_scheduler.run_job.
So I did that in two ways. 1 with use_current_session = true and 2 is false for the same.On my db, results are the same (both returns time in UTC) but on db A, I got UTC time when use_current_session = true and PST when use_current_session = false.
So questions are:
What could be the difference in setup between my db and db A?
Is there a query, logfile, or anything I should check to find out what can be the difference?
I tried to find the cause with my db and I could see the same result as db A which is to see UTC time if use_current_session = true and PST time if use_current_session = false by bringing up the db listener after I set TZ environment variable equal to PST8PDT. However this causes systimestamp from sqlplus session become also a PST time.
The reason I’m playing around with the setup and checking systimestamp value is because we are facing the situation where everywhere except pl/sql job submitted by enterprise scheduler service is pointing wrong timezone (PST instead of UTC)
View 0 Replies
View Related
Jan 2, 2013
We have oracle 10g On windows....
i have created a schedular like below
BEGIN
DBMS_SCHEDULER.create_job (
job_name => 'TEST_JOB',
job_type => 'PLSQL_BLOCK',
[code]....
what is the repeat_interval of above. I have specified MINUTELY but it's not firing after each minute.
View 5 Replies
View Related
Oct 26, 2010
I've written a chain with four programs. The third program is depend on the output of the second. However the third program finishes before the second. How do I wait for the second to finish.
DBMS_SCHEDULER.define_chain_rule
(chain_name => 'SATURN.SHRROLL_CHAIN',
condition => 'TRUE',
action => 'START SHRROLL_STEP',
rule_name => 'RULE_100',
comments => 'START GRADE ROLL');
[code]...
View 2 Replies
View Related
Oct 4, 2012
I need to identify, whether my current session is one of slave sessions scheduled as Oracle scheduler job via DBMS_PARALLEL_EXECUTE or not. I already succeeded using join of dba_scheduler_running_jobs, user_parallel_execute_chunks and v$session, but I feel that this is not optimal approach.
View 1 Replies
View Related
Nov 14, 2010
I have successfully installed Oracle DBMS 11g R2 on Windows 7 64-bit Ultimate. I can only access the EM using only one user which SYSTEM. Although, I created different users which are unlocked but no success in accessing the EM even with the user name 'SYS'.
View 2 Replies
View Related
Mar 4, 2010
i want to tune my plsql code using dbms_profiler.
but dbms_profiler is disabled in my TOAD.
i have GRANT on this pkg. even though i have it disabled. how should i enable it??
View 17 Replies
View Related
Sep 11, 2012
We created a job yesterday which will call the below procedure. if we start this job, it initiates 92 sessions parellely. How it is initiating 92 sessions parelley?
procedure prc_HECTOR_CIDB_IN_PURGE
IS
cursor CUR_PROC is
select rowid from CUSTMODEL.HECTOR_CIDB_IN where PROCESS_FLAG in ('Y','F');
TYPE TYP_CUR_DATA IS TABLE OF ROWID INDEX BY BINARY_INTEGER;
v_typ_cur_data typ_cur_data;
[code]....
View 4 Replies
View Related
Nov 13, 2011
How to stop all jobs(dbms_scheduler) when ever database down or power failure and I need to restart all jobs when ever database is up.
View 3 Replies
View Related
Oct 26, 2010
Oracle 10g has the feature of automatic stats gathering in this case is it necessary to run DBMS_STATS on tables manually. Does the stats gathered become stale when the auto stat runs ?
View 1 Replies
View Related
Dec 20, 2011
I've just installed an Oracle 11.2.0.1.0 64 bit server on my windows 7 machine in order to play around while using attempting to run
exec dbms_stats.gather_table_stats('eii','v2x4e')
I get the following:
ORA-20000: Unable to analyze TABLE "EII"."V2X4E", insufficient privileges or does not exist
ORA-06512: at "SYS.DBMS_STATS", line 20327
ORA-06512: at "SYS.DBMS_STATS", line 20360
ORA-06512: at line 1
My initial google searches indicate that I need the select any table and analyze any privileges. I don't think that can be right/appropriate - but I've granted them anyway to no avail.
Select * from user_tables
returns tables in the System and sysaux tablespaces, but not my own schema/tablespace?
View 5 Replies
View Related
Apr 29, 2013
How to create DBMS_SCHEDULER job for particular instance,we have 3 instance we want to schedule few jobs in Instance 2,how to schedule in Particular instance.
View 3 Replies
View Related
Jul 20, 2010
I have a database job to ANALYZE TABLES,, it takes more than 40 hours. I want to know exactly how much time does it take..
My job has started on 19th Jul at 02:32 hrs.. What is the way to know the exact time when the job ends.
View 4 Replies
View Related
Feb 1, 2013
I have scheduled a job as below.
DECLARE
n1 NUMBER :=7369;
BEGIN
SYS.DBMS_SCHEDULER.CREATE_JOB
(
job_name => 'APPS.SCHE_JOB_TEST'
[code]...
I want to maintain the log table for the job with the following fields.
JOBNAME RECORDS_DELETED JOB_START_TIME JOB_END_TIME JOB_STATUS ERROR_MSG
SCHE_JOB_TEST 1 02/02/2013 00:00:00 02/02/2013 00:05:00 completed null
View 5 Replies
View Related
Sep 17, 2012
I studied the documentation and many websites about DBMS_JOB but I am still confused.How do I schedule a procedure to run i.e. every sunday 10:00 AM ?This is what I tried:
DECLARE
X NUMBER;
BEGIN
SYS.DBMS_JOB.SUBMIT
(
job => X
[code]...
Is the Interval related to next_date ?
View 1 Replies
View Related
Oct 25, 2010
have a requirement to load .dmp files into existing staging tables and there is package to load the ODS tables from staging.So,I thought of using DBMS_Datapump utility to import the data from .DMP files to the Tables and this need be automated.
--Create Directory
CREATE
OR REPLACE DIRECTORY test_dir AS 'C:Test'
--grant Access to the User
GRANT READ, WRITE ON DIRECTORY test_dir TO scott;
--Script to import
DECLARE
l_dp_handle1 NUMBER;
BEGIN
l_dp_handle1 := dbms_datapump.OPEN(operation => 'IMPORT',
[code]...
Errors
ERROR at line 1:
ORA-31634: job already exists
ORA-06512: at "SYS.DBMS_SYS_ERROR", line 79
ORA-06512: at "SYS.DBMS_DATAPUMP", line 938
ORA-06512: at "SYS.DBMS_DATAPUMP", line 4590
ORA-06512: at line 4
View 6 Replies
View Related
Jan 12, 2011
I have scheduled few jobs (scheduled for each day) which has not run today, which was running successfully till yesterday. When I query dba_scheduler_jobs, i could see last_run_date as yesterday's date 6am and next_run_date is still showing today's date and time (it should show tomorrow's date/time).
View 3 Replies
View Related
Nov 29, 2010
I am using Oracle 10G with Toad & want to use DBMS_PROFILER to identify which part of procedure is taking long time.
I created PLSQL_PROFILER_RUNS,PLSQL_PROFILER_UNITS,PLSQL_PROFILER_DATA tables. and I am running DBMS_PROFILER as below.
DECLARE
x INTEGER;
BEGIN
x := DBMS_PROFILER.start_profiler ('Test Profiler');
[code]...
The procedure run is successfully completed.I gave the following command to see the data,
SELECT runid, run_date, run_total_time, run_comment
FROM plsql_profiler_runs;
SELECT runid, unit_number, unit_type, unit_owner, unit_name, unit_timestamp,
total_time
FROM plsql_profiler_units
SELECT runid, unit_number, line#, total_occur, total_time, min_time, max_time
FROM plsql_profiler_data
No data is displayed. Then I created these tables in SYS and gave grant to public.Yet It's same. No data is coming into the tables.
View 5 Replies
View Related
May 29, 2012
I want to display Boolean value of a variable in DBMS Print statement. I am able to do it by using simple if condition checking .How to print the value of Boolean variable directly ?
SQL> declare
2 boo boolean := true;
3 begin
4
5 if boo then
6 dbms_output.put_line('boolean variable value TRUE by checking if condition ');
[code]....
ORA-06550: line 9, column 24:
PLS-00306: wrong number or types of arguments in call to '||'
ORA-06550: line 9, column 3:
PL/SQL: Statement ignored
View 6 Replies
View Related
Jul 13, 2010
When performing test recoveries of a database we often wish to prevent database jobs from running application processes such as (a) sending emails; or (b) logging events to a central logging database. In order to accomplish this, we set the job_queue_processes to zero before opening the database.
This means that no dbms_jobs run on the open instance, but it does not prevent dbms_scheduler jobs from running.How can we prevent any dbms_scheduler jobs from running?
I have looked at setting the MAX_JOB_SLAVE_PROCESSES attribute using DBMS_SCHEDULER.SET_SCHEDULER_ATTRIBUTE, but this cannot be set to zero.
View 3 Replies
View Related
Mar 21, 2013
i have to grant permission to a user on a package dbms_transaction.After i granted permission i am getting error:
ORA-01031: insufficient privileges
ORA-06512: at "SYS.DBMS_TRANSACTION", line 88
ORA-06512: at line 1
View 7 Replies
View Related