PL/SQL :: Error When Subtracting 2 Dates In Package Using Toad?

Oct 21, 2013

I am having a problem when calculating dates in a package usiong Toad. I have my function : 

FUNCTION PORTFOLIO_MEMO_RPT_Sql( schema_name IN  VARCHAR2  , select_business_date IN  DATE ) RETURN VARCHAR2.....SELECT DISTINCT       Case     when NVL(TO_DATE(''09/24/2013'',''MM/DD/YYYY'') - DECODE(mn.Active, 1, mn.DueDate, sc.DueDate ),0) = 0 then ''0Days''     when NVL(''' || select_business_date  || '''   - DECODE(mn.Active, 1, mn.DueDate, sc.DueDate ),0) = 0

then ..... when I give it my variable from outside , it is not working......but when I use a date inside, it works. I call my function from outside like :

SELECT * FROM  TABLE ( FI_rpt.Fi_Rpt_Pkg_loan.PORTFOLIO_MEMO_RPT (sys_context('userenv','session_user'),TO_DATE('09/24/2013','MM/DD/YYYY')) )

View 17 Replies


ADVERTISEMENT

SQL & PL/SQL :: Subtracting Two Dates In String Format Without AM Or PM?

Sep 26, 2013

I have a peculiar situation where i have a column which has a string. The text has to be parsed to identify two date strings.

After converting the strings to date they have to be subtracted to obtain the time taken.

Table to create

CREATE TABLE JOB_EXECUTION
(
RUN_DATE DATE,
RUN_ORDER NUMBER,
RUN_DIV VARCHAR2(50),
RUN_TYPE VARCHAR2(50),
RUN_FMT VARCHAR2(50),

[code]....

Insert sample data

INSERT INTO JOB_EXECUTION (RUN_DATE ,RUN_ORDER ,RUN_DIV ,RUN_TYPE ,RUN_FMT ,PICKUP_STATUS ,START_TIME ,END_TIME ,REMARKS) VALUES
(sysdate-1,1,'AE','FILE-HFM','NY_PLAN-2014','FINISHED',TRUNC(SYSDATE),SYSDATE,'"Load Process is INITIATed: with [BATCHID:= FILE-HFM_RUN_ORDER#_5 ]: as of @ 26-Sep-2013 10:26:50.
AFM-Load END PROCESS: as of @ 26-Sep-2013 10:26:52.
AUTO-LOAD RUNNING :as of @ 26-Sep-2013 10:26:57.
FILEs-LOAD PROCESS: as of @ 26-Sep-2013 10:26:59.
ALLOCATIONs PROCESS: as of @ 26-Sep-2013 10:27:52.

[code]....

The select I tried.

WITH reporting_info AS (
SELECT b.run_date,b.run_div,b.run_type,b.run_fmt,1234 as Batch_id, start_time as BATCH_START_TIME, end_time AS BATCH_END_TIME,
REPLACE(substr(substr(remarks,instr(remarks,'FILEs-LOAD PROCESS: as of @ ')), 0,instr(substr(remarks,instr(remarks,'FILEs-LOAD PROCESS: as of @ ')),chr(10))-2 ),'FILEs-LOAD PROCESS: as of @ ','') FILE_LOAD,
REPLACE(substr(substr(remarks,instr(remarks,'ALLOCATIONs PROCESS: as of @ ')), 0,instr(substr(remarks,instr(remarks,'ALLOCATIONs PROCESS: as of @ ')),chr(10))-2 ),'ALLOCATIONs PROCESS: as of @ ','') ALLOCATION,

[code]....

Since the date format does not contain AM or PM in it ... while subtracting time values crossing midnight the value goes in negative .... How to subtract two date strings with out AM or PM values to get a positive value ?

View 5 Replies View Related

Balance Calculation And Subtracting / Displaying Dates?

Sep 3, 2010

My problem is that I am working with a balance (Infor/WorkBrain - Time & Attendance) I have a balance called Bank Holiday(bal_id 10044). Every holiday that an employee works, he is allowed to take another day off in lieu of the day he worked. The employee has up to twelve months to take that holiday.

My job is to figure out when he worked that holiday (not a problem) and send an email/note at the 11 month mark and notify the employee and supervisors that said employee has 1 month to use his banked holiday.

Here is what the employee_balance log looks like.

EBLOG_IDEMP_IDBAL_IDEBLOG_DELTAWRKS_WORK_DATEWRKS_IDEBLOG_MESSAGE
51200128537100441 10/15/2010 5281229TCODE_NAME:FR_HWS
51150828537100441 7/1/2010 5136881TCODE_NAME:FR_HWS
51150928537100441 7/27/2010 5136942TCODE_NAME:FR_HWS
51150528537100441 8/1/2010 5137137TCODE_NAME:FR_HWS
5294372853710044-1 8/31/2010 5137173TCODE_NAME:FR_HWO
52947828537100441 6/3/2010 5001014TCODE_NAME:FR_HWS

My problem is the data/constraints I am working with. I can tell what day the holiday was based on a time code (EBLOG_MESSAGE) and EBLOG_DELTA shows a positive 1. I can also tell when the employee has used a bank holiday (EBLOG_DELTA is -1) and EBLOG_MESSAGE = FR_HWO.

But how to I perform the deduction so that I get four most current dates. Meaning since my first date that the employee gets for a holiday wokred is 6/3/2010 but the employee used a bank holiday on 8/31/2010. So I want to display the dates 7/1/2010, 7/27/2010, 8/1/2010 and 10/15/2010.

My preference would be not to add anything new to this table as it is a core table for Infor/WorkBrain.

View 2 Replies View Related

PL/SQL :: Run Package In TOAD?

Jun 11, 2012

I have created a PL/SQL package and complied it and I got a meaasge with no errors.But I dont know how do I run the package to check whether the data has been populated in tables or not.I want to know do I need to write any code for execution to see the output.If I need to write how can I do it in TOAD.

View 6 Replies View Related

PL/SQL :: How To Use Toad To Compile New Package

Nov 14, 2012

I am not very familiar with Toad, if developer gives modified package, I need to replace this package and compile it . How to do it in Toad .

View 4 Replies View Related

Client Tools :: Access Violation Error In Toad?

Jun 2, 2008

What i have to do to overcome the following error..whenever im using toad im getting this error since start writing and executing procedures and functions.

access violation at address 006b5b1b in module 'toad.exe' read of address 0000011d

View 4 Replies View Related

PL/SQL :: Find Duration By Subtracting Start And End Time?

Jun 25, 2013

Version: 11.2 I am not an SQL expert. I am trying to subtract the start time and end time and thereby find the difference between these two times. In the below example , the difference between start_time and end_time is around 52 minutes (6:15 PM to 7:07 PM)I tried some stuff to find the difference below. But it didn't work out .  

SQL> create table t (start_time date, end_time date); Table created. SQL> desc t Name Null?    Type ----------------------------------------------------------------- -------- --------------------- START_TIME  DATE END_TIME DATE SQL> insert into t values (to_date('24/JUN/2013 18:15:42', 'DD/MON/YYYY HH24:MI:SS'), to_date('24/JUN/2013 19:07:54','DD/MON/YYYY HH24:MI:SS')); 1 row created. SQL> commit; Commit complete. SQL>SQL>SQL> select * from t; START_TIME               END_TIME--------------------     --------------------24 Jun 2013 18:15:42    

[Code] .......

View 5 Replies View Related

Client Tools :: Connect With Database Through Toad - It Throws Error?

Apr 23, 2012

there is a problem , related to toad. when i try to connect with my database through toad then it throws an error-"Can't initialize OCI. Error -1", how to sort out of this problem. and i am using toad 9.2.7.1 on widows server2008.

View 9 Replies View Related

Client Tools :: Toad Error / Can't Continue Running Procedure

Jun 4, 2012

I run procedure on toad 10.5, it gave me this error

Buffer overflow, limit of 20000 bytes

then it can not continue running the procedure.

View 8 Replies View Related

Export/Import/SQL Loader :: Getting Error While Importing DMP File Through Toad

Oct 25, 2012

Im trying to import DMP file through Toad but below error while importing. My DMP file from 11G and importing into 10g server.

ORA-39000: bad dump file specification
ORA-39143: dump file "D:oracleproduct10.2.0adminorcl1dpdumpdumpfile1.dmp" may be an original export dump file

View 21 Replies View Related

Client Tools :: TOAD Error ORA-00900 Procedural Software Installation?

Nov 8, 2011

We use this software Toad for Oracle here and I have just started learning PL SQL.I am coming across a few errors in Toad for Oracle

First of all,

When I execute snippet (Ctrl + Enter), I get this ORA-00900 error and the message that I need to upgrade my version of knowledge xpert. I did that to 10.1. I then restarted my computer and now it is still showing me that error ORA-00900 but without any message. I do not get output, even for simple programs but when I try to execute snippet, it asks for my 'Edit SQL' screen and after which it gives me a few outputs.

View 1 Replies View Related

Application Express :: Difference Between Two Dates Error

Aug 3, 2013

i'm trying to get the difference between two dates so i have two date itemsthen i did daynamic action (set Value) and choose pl/sql function then added the following codeDecalrestart_date date;end_date datebeginstart_date:=to_date(:p20_start_date,'dd/mm/rrrr');select to_date (sysdate,' dd/ mm /rrrr')into end_datefrom dual;return end_date-start_date;end; but when i run the page i got error ora-01861

View 1 Replies View Related

SQL & PL/SQL :: Function That Accepts 2 Dates - Not A Valid Month Error

Apr 15, 2011

I have function that accepts 2 dates namely sDate and eDate i.e start and end dates. See the declaration part of the function:

startDate eab.eod_date%type;
endDate eab.eod_date%type;

begin
startDate := to_date(sDate,'DD-MON-YY');
endDate := to_date(eDate,'DD-MON-YY');
end

When I called the function it gives me the following error: ORA-01843: not a valid month..And I tried to simulate the process, the below code also show the same error:

select TO_DATE(to_date('13-DEC-09', 'dd-MON-yy', 'nls_date_language=english'),'DD-moN-YY') from dual;

how I can check that error. I need to pass dates to my function.

View 8 Replies View Related

SQL & PL/SQL :: Compiling Package And Seeing Error

Jun 11, 2012

How to see the error Oracle is returning?

SQL> select owner, object_name, object_type from sys.dba_objects
2 where status = 'INVALID' order by owner;

OWNER
------------------------------
OBJECT_NAME
--------------------------------------------------------------------------------
OBJECT_TYPE
-------------------
CRMAPP
CRM
PACKAGE BODY

SQL> alter package CRMAPP.CRM compile;

Warning: Package altered with compilation errors.

SQL> show errors;
No errors.

SQL> select owner, object_name, object_type from sys.dba_objects
2 where status = 'INVALID' order by owner;

OWNER
------------------------------
OBJECT_NAME
--------------------------------------------------------------------------------
OBJECT_TYPE
-------------------
CRMAPP
CRM
PACKAGE BODY

View 2 Replies View Related

SQL & PL/SQL :: Package Compilation Error

Jan 4, 2012

when am trying to compile package, am getting the below error am not understanding whats that exactly ,

PLS-00103: Encountered the symbol "FUNCTION" when expecting one of the following:

end not pragma final instantiable order overriding static
member constructor map

View 3 Replies View Related

SQL & PL/SQL :: Package Error - Invalid Identifier?

Mar 4, 2012

way give error in package below

SQL> CREATE OR REPLACE PACKAGE DATA_BKG AS
2
3 TYPE OBJ_DEPT IS RECORD
4 (
5 DEPT_ID NUMBER(10),

[code]...

View 7 Replies View Related

SQL & PL/SQL :: Numeric Or Value Error In Stored Package

Oct 28, 2010

I am getting the below error in a Stored Package.

SQL> BEGIN
2 NCOTE.OTEGENERATOR;
3 END;
4 /
BEGIN
*
ERROR at line 1:
ORA-06502: PL/SQL: numeric or value error: character string buffer too small
ORA-06512: at "GENEVA_ADMIN.NCOTE", line 3
ORA-06512: at line 2

I must be trying to do a select or put some other value into a variable that is too small. The Odd thing is that when I run the stored procedure again (as long as I don't exit from sqlplus)...

SQL> BEGIN
2 NCOTE.OTEGENERATOR;
3 END;
4 /
PL/SQL procedure successfully completed.

why the process is successful the second (or third, etc) call from the sqlplus but not the first. If I exit sqlplus and then start it again, once more I get the error again.

View 6 Replies View Related

SQL & PL/SQL :: Error While Compiling Package Body?

Jun 28, 2011

When i compile the package body i get errors.

CREATE OR REPLACE PACKAGE BODY CEE_OSPCM_PKG AS
PROCEDURE CEEOT_WORK_TYPE_PRC IS
CURSOR CUR_WORK_TYPE IS
SELECT *

[code]...

View 7 Replies View Related

SQL & PL/SQL :: Package Variables And Execution Error

Sep 27, 2013

I have a package with pipelined function in it. using the below stmt to execute the function in Oracle 11g.

select * FROM table(Test_PKG.Test_PIPELINED ('A','--N/A--','1/1/2010','1/1/2011'));

Throwing an error: invalid month error.

CREATE TYPE WBS_ROW IS OBJECT
(
Product VARCHAR2 (100),
DESC VARCHAR (1000),
RecDATE DATE);

[code]....

View 12 Replies View Related

SQL & PL/SQL :: (error) PLS-00103 / Creating Package

Jul 19, 2012

When trying to create package I receive this error...[Error] PLS-00103 (8: 16): PLS-00103: Encountered the symbol "." when expecting one of the following:;

pointing to "." in the last line "END nondrg_prod.Readmissions;"

CREATE or replace PACKAGE nondrg_prod.Readmissions AS
TYPE Readmits IS REF CURSOR RETURN READMISSIONS_DATA_MH%ROWTYPE;
PROCEDURE open_rdmh (rdmh IN OUT rdmhCurTyp);
END Readmissions;

[code]....

View 14 Replies View Related

PL/SQL :: Error While Running UTL_MAIL Package

Aug 8, 2012

SQL> conn system/sys@ORCL;
Connected.
SQL> @F:oracleproduct10.2.0client_5RDBMSADMINutlmail.sql

Package created.
Synonym created.

SQL> @F:oracleproduct10.2.0client_5RDBMSADMINprvtmail.plb

Warning: Package Body created with compilation errors.

Errors for PACKAGE BODY UTL_MAIL:

LINE/COL ERROR
-------- -----------------------------------------------------------------
319/5 PL/SQL: SQL Statement ignored
320/10 PL/SQL: ORA-00942: table or view does not exist
325/7 PL/SQL: SQL Statement ignored
326/12 PL/SQL: ORA-00942: table or view does not exist

View 2 Replies View Related

Forms :: Error While Compiling Package Body

Sep 3, 2010

while compiling this package body, i get error

error 102 at line 21 column 11
encounterd symbol "Group" when expecting one of following

begin function package pragma procedure subtype type use form cursor

View 5 Replies View Related

SQL & PL/SQL :: Getting Expecting External Language Error When Compiling Package

Sep 27, 2013

It's been some time since I've written any PL/SQL, I'm getting Found 'CURSOR' Expecting: External Language for line 76 when I try to compile? :

1 create or replace PACKAGE pa_user_maint
2 AS
3
4
5 -- ------------------------------------------------------------------------------------
6 -- Exceptions
7 -- ------------------------------------------------------------------------------------
8
9 -- User Exists
10
11 ex_existingUser exception;
12 PRAGMA EXCEPTION_INIT (ex_existingUser, -01920);
13
[code].......

View 1 Replies View Related

Finding Individual Dates Having Dates Plus 2 Days

Jan 26, 2011

I want to find the dates which have a date plus with in 2 days after this date. I mean group by 3 days each even the date i missing between two days. Actualy I want to find the start date where the employ was missing on job.

Basic concept is employes have allowed to use 10 personal leaves of a year. Each leave can be use for maximum 3 days.

If employ did not come on the job for one day or two days or three days, it shoul be count as ONE personal leave. And If employ is missing at job for four or five days, it should be count as 2 personal leaves.

seq date
------------------------------
101.01.10

205.01.10
306.01.10

410.01.10
512.01.10

613.01.10
714.01.10
815.01.10

916.01.10
1018.01.10

1119.01.10
1220.01.10
1321.01.10

1423.01.10

1526.01.10
1627.01.10

1729.01.10
1831.01.10

The result should be (Don't use Pl/Sql)

seq date
------------------------------
101.01.10
205.01.10
310.01.10
413.01.10
516.01.10
619.01.10
723.01.10
826.01.10
929.01.10

After finding these days I want to select the starting date of 5th personal leave. (which is 16.01.10).

I am not a expert of using SQL, but I think it could be possible with using partitioning a table on the givin reslult and further partition the reslut on rownum() as rn and the using case statement where rn = 5.

View 2 Replies View Related

SQL & PL/SQL :: Split A Date Into New Dates According To Black Out Dates?

Mar 10, 2011

Split a date into new dates according to black out dates!

Here is my tables:

CREATE TABLE travel
(
start_date,
end_date
)
AS
SELECT DATE '0000-01-01', DATE '9999-12-31' FROM DUAL;

[code]....

I have lets say a "travel date" and black out dates. I will split the travel date into pieces according to the black out dates.

Note: Travel Date can be between 0000-01-01 - 9999 12 31

Sample:

Travel Date:

Travel | START DATE | END DATE
T | 2011 01 04 | 2011 12 11

Black Out Dates:

BO | START DATE | END DATE
A | 2010 11 01 | 2011 02 11
B | 2011 01 20 | 2011 02 15
C | 2011 03 13 | 2011 04 10
D | 2011 03 20 | 2011 06 29

Excepted Result:

New Travel | START DATE | END DATE
X1 | 2011 02 16 | 2011 03 12
X2 | 2011 06 30 | 2011 12 11

Visually:

Travel Date : -----[--------------------------]--

A : --[------]-------------------------
B : ------[---]------------------------
C : --------------[---]----------------
D : ----------------[------]-----------

Result :

X1 : -----------[--]--------------------
X2 : -----------------------[--------]--

Sample 2:

Travel Date : -[--------------------------------]--

BO Date A : ----[------]-------------------------
BO Date B : -------------------------[---]-------
BO Date C : ----------------[---]----------------
BO Date D : ------------------[------]-----------

Result X1 : -[-]-------------------------------
Result X2 : -----------[--]--------------------
Result X3 : -----------------------------[--]--

How can I do it using PL SQL ?

View 5 Replies View Related

PL/SQL :: Find Out In Database Package Where Package Is Installed

May 28, 2013

I need to find out in DB Package where this Package is installed (in which schema). The problem is this DB Package can be installed in various schemas. This means that I can't use select user from dual or system environment SYS_CONTEXT('USERENV', 'OS_USER').

What I would need is something like $$PLSQL_UNIT

View 8 Replies View Related

SQL & PL/SQL :: Global Exception In Package Available Outside Package?

Jan 15, 2012

I have a package with several procedures which raise and catch an error if a foreign key constraint has been violated. I put the the following code in my package body:

e_ouder_niet_gevonden EXCEPTION;
PRAGMA EXCEPTION_INIT(e_ouder_niet_gevonden,-2291);

Now all the procedures inside the package which catch this exception in the EXCEPTION block work fine. I would like to be able to use that exception outside of my package as well though, how would I do this?

View 4 Replies View Related

Select All Dates Between Two Dates

Oct 22, 2003

How can I select all of the dates between two dates? For example, given the start date 12/2/2003 and the end date 12/5/2003 I want to return:

12/2/2003
12/3/2003
12/4/2003
12/5/2003

Is there a built in function for this? Is there a way for a function to return multiple rows? It has to be a function because I need to use it within other SQL statements.

View 14 Replies View Related

How To Connect Toad With 10g

Jan 9, 2010

i have installed oracle 10g and toad but i don't know how to connect toad with database

View 1 Replies View Related

Can't Connect Through TOAD

Oct 9, 2012

I am Using Toad 9.3 and try to connect Oracle DB 11g through SYS but fail, because it is showing ORA-01031:Insufficient privileges.Although the same, I can connect through SQL * Plus. Is there any way to connect SYS (in TOAD).

View 1 Replies View Related







Copyrights 2005-15 www.BigResource.com, All rights reserved