the job I want to get the email notification(error messge also), when any of the steps in the chain fails in the job.I have tried this scenario, but I am not getting the error message if a program in the chain fails.
I tried using UTL_SMTP to send simple emails. My code is as follows:-
PROCEDURE prc_send IS - variable to hold the smtp server connection v_smtp_connection utl_smtp.connection; -- variable to hold the contents of the email message v_smtp_host VARCHAR2(100) DEFAULT 'smtp.server.com'; -- variable to hold the smtp port v_smtp_port NUMBER DEFAULT 25; BEGIN -- establish the connection to the smtp server [code].........
When I execute this, It shows authentication error. Error looks like ORA-29278: SMTP transient error: 454 5.7.3 Client was not authenticated. I know my smtp server requires password authentication. But I am not aware of how to do it with UTL_SMTP.
I developed a program to send e-mails from Oracle using both UTL_MAIL as well as UTL_SMTP. My requirement now is to send around 75,000 emails per day, When I tested for 1000 emails it is taking around 6 mins., Then for 75,000 it would be around 7-8 hours. Not to put the server busy for these many hours. Can we really send this much of e-mails from Oracle? UTL_MAIL is little faster than UTL_SMTP)
We have a scheduler chain that calls 2 scheduler programs.The chains are controlled by a scheduler job that has job_type as CHAIN.My challenge is how to add email notifications on the failure or success of the programs.
I know about this procedure DBMS_SCHEDULER.ADD_JOB_EMAIL_NOTIFICATION, but this is only applicable to jobs and not programs(i believe). Is there an alternative way to trigger off emails for scheduler programs ?
i want to schedule a job chain. I 've created 4 chain steps. The first perform an action and the second must be executed only if the first completed successfully. The third must be executed only if the second ends successfully, etc.
The Chain_rule_2 is CHAIN_STEP_1 Completed and CHAIN_STEP_1 SUCCEEDED The chain_rule_3 is CHAIN_STEP_2 Completed and CHAIN_STEP_2 SUCCEEDED ... But the job is actually running because there isn't an end steps (I suppose). End step must be done if all steps works fine or if only one failed.
I have a few questions and doubts regarding to cache buffer chains and lru chains.
1. What can possibly cause the cache buffers chain ? 2. Can it be resolved by increasing the free lists and increasing the inittrans of the block after identifying the hot buffers? (The table spaces are not a ASSM.) 3. How can we classify where the cache buffer chain is caused? Is there anything like extent level, header level? ( i don't understand this part due to the reason i see many operations against cache buffer chain event in stats pack reports). 4. Is cache buffer chain is related to the cache buffers chain event too? 5. In such case, tuning either of the contention will resolve the other if both exists?
Am facing a problem in sending an email to certain group of people, if the recipient just one person it will work but if more it will not work, I tried to read every one as a single recipient through a cursor but it was not working, the following is the sending
OS: RHEL 5.7 64 bit DB: 11.2.0.2 Standard Edition 64 bit
Everyday EOD is run and after the eod, users are requesting to receive a mail confirming the same from the database. For this we need to configure automated email which will be sent to a list of users email ID immediately after the EOD is done.
Does cache buffer chain latch and buffer busy wait event are related to one any another.
Latch definition from Google says : Latches are simple, low-level serialization mechanisms to protect shared data structures in the system global area (SGA).
what does it mean my protect. Does this mean protects from aging as per LRU algorithm and getting removed from SGA or protect from other processes ,say from example from simultaneously DML operations. or both
Does buffer busy wait event occurs , because of the cache buffer chain latch ?
How to pass parameter value to a procedure in schedule jobs ?
--procedure : create or replace procedure updating_temptable(empcode in varchar2) is begin update ts_employee_master mas set mas.last_accessed = sysdate where mas.employee_code = empcode; end;
--scheduler
begin sys.dbms_job.submit(job => :job, what => 'updating_temptable;', next_date => to_date('24-04-2012 00:30:00', 'dd-mm-yyyy hh24:mi:ss'), interval => 'TRUNC(SYSDATE)+1+30/1440'); commit; end; /
How to pass employee_code in the procedure[updating_temptable ] in dbms job scheduler ?
why the Scheduler is not sending out notifications for a job I am running.I set up a small job that calls a programm which references a stored procedure. The procedure executes a manual refresh of a materialized view.
I did set up the SMTP parameters EMAIL_SENDER and EMAIL_SERVER, restarted the instance afterwards and verified that the parameters are set by logging into the Enterprise Manager web console and looking at the page with the email server parameters.
I did verify that the job did actually start and complete successfully by checking the logs in ALL_SCHEDULER_JOB_RUN_DETAILS
I did verify that I actually do have the notifications activated by checking ALL_SCHEDULER_NOTIFICATIONS...There are notifications for all events (JOB_STARTED, JOB_COMPLETED, JOB_SUCCEEDED, JOB_FAILED, etc.) for my job
I also verified that the materialized view has actually been refreshed by checking in ALL_MVIEW_REFRESH_TIMES
I also verified that the email server I am using is sending out emails by sending a test email from the shell using the same sender and recipient addresses as I am using in the notification settings.What could the reason be for the scheduler not sending out emails?
We use AIX 6.1 and 10.2.0.4.0 - 64bit. When we create an Job it will be execute as OS User Oracle, but this is not wanted.The file permisions are set as described in Guide to External Jobs on 10g with dbms_scheduler e.g. scripts,batch files
BEGIN dbms_scheduler.create_schedule( schedule_name => 'INTERVAL_EVERY_1_MINUTES', start_date => trunc(sysdate)+18/24, repeat_interval => 'freq=MINUTELY;interval=1', comments => 'Runtime: Every day all 1 minutes'); END;-- program code BEGIN
[code]....
all above three code compiled successfully . but it is not running automatically and not run every 1 minute.
I try to run this manuall by using following code
BEGIN dbms_scheduler.run_job('JOB_FEED_UK_DATA',TRUE); END;
It works fine..
create or replace PROCEDURE LOAD_CUSTOMERS_UK IS BEGIN Insert into CUSTOMERS_UK (ID, NAME, CITY) VALUES (1,'SMITH','LONDON'); Insert into CUSTOMERS_UK (ID, NAME, CITY) VALUES (2,'JONES','LONDON'); Insert into CUSTOMERS_UK (ID, NAME, CITY) VALUES (3,'BROWN','BRIGHTON');
I am having a problem getting to run an Oracle file watcher job successfully. The file watcher starts on schedule and I can see the entries in the DBA_ SCHEDULER_JOB_RUN_DETAILS table. However, I see a status of FAILED with an error 1024. Under additional information I get the following 2 Oracle errors:
ORA-01024: invalid datatype in OCI call ORA-21560: argument 7 is null, invalid, or out of range
The job is trying to start a stored procedure with one input parameter and signature: PROCEDURE SP_HFU_NTS_FILE_WATCHER_ACTION (p_sfwr SYS.SCHEDULER_FILEWATCHER_RESULT).
I have to fire "EXPORT BACKUP COMMAND" depend on the EOD Process.
ie:
1) We have a EOD Process, which would be completing between 8pm to 6am. 2) After this EOD process, we have to take EXPORT Backup. 3) The above mentioned steps are being done manually.
Now i want to make them automated:
4) ie if the EOD process completed between the mentioned time. then Export command should be run, otherwise should not happen.
I saw bunch of other posts but I could find the post that exactly explaining about where the value returned as systimestamp / sysdate comes from or impacted Here is my situation I have an access to this db (let me call db A) and when I access it, I get following result. I don’t have full access to this db so I cannot experiment a lot here.
I’m in PST timezone.I have my db which I have full access as well as its host.I can make result like db A on my db if I started up db and its listener while TZ environment variable equal to UTC.Now I saw in other post that someone was trying to retrieve systimestamp value in a job executed via dbms_scheduler.run_job.
So I did that in two ways. 1 with use_current_session = true and 2 is false for the same.On my db, results are the same (both returns time in UTC) but on db A, I got UTC time when use_current_session = true and PST when use_current_session = false.
So questions are: What could be the difference in setup between my db and db A? Is there a query, logfile, or anything I should check to find out what can be the difference?
I tried to find the cause with my db and I could see the same result as db A which is to see UTC time if use_current_session = true and PST time if use_current_session = false by bringing up the db listener after I set TZ environment variable equal to PST8PDT. However this causes systimestamp from sqlplus session become also a PST time.
The reason I’m playing around with the setup and checking systimestamp value is because we are facing the situation where everywhere except pl/sql job submitted by enterprise scheduler service is pointing wrong timezone (PST instead of UTC)
I want to schedule a procedure in oracle and not from the Tash scheduler utility.Is there any way to schedule the procedure at database level.I want to run the procedure daily at specific time.
We have scheduled some Jobs such as monthly, semi-annually reports using dbms_scheduler. we use 10gR2 software and windows 2003 server. we have a report which supposed to run at 4:00 AM and as soon as the report finishes it sends the report as email to the authorized users. when the scheduler ran the report inside the report it shows as ran at 3:08 AM where they get systimestamp. but when i query the
select last_stat_time, next_run__date from dba_scheduler_jobs where job_name ='TEST';
last_start_time next_run_date 03-DEC-12 04.00.00..223000 AM -04:00 07-JAN-13 04.00.00..200000 AM -04:00
when I query systimestamp from dual on that database from sqlplus: i get the following: systimestamp 04-DEC-12 07.40.16..152000 AM -05:00
I see the difference of -04.00 and -05.00 from both of the queries. i know the systimestamp from dual is correct. how to I fix the scheduler Job to run at the correct time with daylight savings to take effect?
I've written a chain with four programs. The third program is depend on the output of the second. However the third program finishes before the second. How do I wait for the second to finish.
How to create DBMS_SCHEDULER job for particular instance,we have 3 instance we want to schedule few jobs in Instance 2,how to schedule in Particular instance.
Why Oracle shceduler is not running.What could be the cause.
CREATE TABLE dept1 AS SELECT * FROM dept; CREATE OR REPLACE procedure update_record(p_deptno number)is BEGIN insert into dept1 values(p_deptno,'xxx','xxx'); end;