I have written a Database procedure to move data from one data to another database using Database link. When i run that procedure on Sql it is running fine, but i use same procedure in a button in form using "When-Button-Pressed" trigger it generates error, error code is ORA-02055 and ORA-02067.
OLPT DB --> OLPT DB (Physical Standby, active dataguard) --> Data warehouse DB
We only allowed to connect to OLPT DB (Physical Standby, active dataguard) from Data warehouse DB. If there is possibility to use some of Oracle "native" method of data extraction (replication) from OLPT DB (Physical Standby, active dataguard) to Data warehouse DB.
As far as I know we cannot create materialized view log in OLPT DB (Physical Standby, active dataguard) in order to do data replication, but maybe there is some others ways?
Does Oracle supports an index that only contains a sub-set of the records in a table?
For eg - A table has 1 million records, can we have a index which contains suppose 100k records. We have used a similar logic in DMSII in Unisys. Not so sure if Oracle supports it.
We plan to move the database to a new host with much more RAM, CPU. The new database server will have exactly the same OS version, Kernel version and the same version of database / grid standalone (ASM). I will have to install OS, Database software, Grid Standalone on the new server.
The current version of the database is 11.2.0.3.0 Enterprise Edition and the OS version is Oracle Enterprise Linux 6.3. However, we plan to use the same disks (ASM disks). I believe I don't need to use RMAN to do the migration, Is it correct?
I have to move data from old tables into new tables. I use a sqlplus script and execute multiple 'insert from select'. I thought the SQL statements are executed in sequence, one after the other. I run into this problem: Let's take this script for an example
insert into A (a,b,c,.... select a,b,c...... from X; insert into B (a,b,.... select a,b,.... from A joined with Y; commit;
After executing the script in our development DB
select count (*) from A returns 200
When the script is executed in production, A table record count is 5
select count (*) from A joined with Y; (used in the second insert)
returns 200.
It seems that the two statements are executed at the same time and table A is not fully populated when the select in statement two is executed.I suspect this is due to parallel execution in production.
Will executing
ALTER SESSION DISABLE PARALLEL DML; ALTER SESSION DISABLE PARALLEL QUERY ;
I have database A and B , we are strictly restricted to not to create any DB links between these database. In database A based on complex logic we in a stored procedure we populate the data to table type..now dot net will take this table type data and insert the same in database B.
Question here :
1.When we try to bulk collect all the data into table type , i am getting error operand exceeds limit, but it is mandate to put all data in one short to table type as dot net will take that and insert into B database. 2.Is there any good logical method to achieve this in a simple way.
I have two tables with almost the same columns. Table A has 50 columns, Table B has 51 columns, which are defined exactly the same except one more column as LOAD_TIME.
Is there any easy way for me to move the data from Table A to B? the Extra column LOAD_TIME will be set as current system time. All I want is to avoid list all 50 column names. The following SQL has error ORA-00923 error.
I have a range partitioned table with one lob column. Each partion is on a separate tablespace except two partitions which are on same tablespace. Now I want to move a partition from one tablespace to another tablespace along with lob data. By using a simple alter table move partition will also move the lob data or there is some special procedure to adopt.
I want to move a oracle job from one database to another database. i tried to open the job from toad by pressing f4 on it in editor , im getting message like...
"unsupported type for describe popups (Without DB admin module)
I am trying to move data from one schema in database A to another schema in database B and only move data not others (procedure, view, function). What is the best way to do it? I am thinking database link then insert into select from database link. Is there a better way?
I want to move the data in the VARRAY column BT_DETAIL to another table. I have create a staging table BT_STG which contains a surrogate key column and the columns from the VARRAY. I am creating this staging table at run time.
Are there any good information about on how to move a 10g database to a new server? We will keep the same disks on the SAN, but make a new installation on the new server.
We are migrating database from HP to AIX. Data is all on SAN.I can do it through RMAN convert. What I want to know is if it is possible to move data at storage level without using Convert command?
I am using SQL developer 2.1 to migrate tables from Sybase 12 database to oracle 11g. I have used online data move option for moving sybase data into oracle tables, but even after data move is completed not all rows have been moved from sybase tables to corresponding oracle tables. Some rows are missing but still there is no error message being displayed, how to find out what's going wrong.
We have oracle 9i database named A with 2 schema A1 and A2.User enters data at A1 schema and the incremental data moved to A2 schema after some verfications performed by some scheduled job on A1 schema.
we want to move this incremental data to B1 schema of another oracle 9i database B at the real time when data gets entered to A2 schema of A oracle 9i database. We have access to A2 schema of A database and B1 schema of B database.way to do it or best practice to do this activity or if there is any third party tool or any available oracle utility to perform it?
Note: A2 schema of A database and B1 schema of B database has one to one mapping.We want to avoid using trigger on A2 schema, how data gets populated from A1 to A2 schema .
I am exporting using query parameter. I am trying to export subset of table using rowid.
SQL> select rowid , name from tab1;
ROWID NAME ------------------ --------------- AAAM0rAAEAAAAGMAAA sam AAAM0rAAEAAAAGMAAB sona AAAM0rAAEAAAAGMAAC rose AAAM0rAAEAAAAGMAAD chris AAAM0rAAEAAAAGMAAE san .................. .... .................. ....
move the tables with data present in the user scott(full) to another schema named test. In my case scott is in user tablespace and for test schema i have created different tablespace named test_tbs.