When I run a query form the the Query Window in Visuial Studios 2012 all the date fields truncated to 'mm/dd/yyyy', but i need the full date returned. I am able to get full date from TO_char(MyDateField, 'yyyy-mm-dd hh24:mi:ss'), but if I do TO_DATE(MyDateField, 'yyyy-mm-dd hh24:mi:ss') it only returns 'mm/dd/yyyy'. I'm sure this is a simple setting in Visual studios but I cant find it to save my life. Is there there a way to have the full date returned by default?
A field named xxx_date is a text item which we have to enter manually so as to update a record in that particular date. This is a mandatory field without which we cannot continue the data entry..
I am getting this error while trying to update the record
FRM-40509 :Oracle error :unable to update record
I have kept the enabled = yes required=no data type=Date.. in the property pallet
I want to reset my date to this format: 12/31/2012 11:59:59 PM - see code below:
DECLARE v_latest_close DATE; BEGIN v_latest_close := TO_DATE ('12/31/2012 23:59:59 ','MM/DD/YYYY HH24:MI:SS'); DBMS_OUTPUT.PUT_LINE('The new date format is : '|| v_latest_close); END;
the code above displays only : 12/31/2012 instead of 12/31/2012 11:59:59 PM
I'd really like to get the difference expressed in hours, minutes and seconds. I tried:
, TO_CHAR(fcr.actual_completion_date, 'HH24:MI:SS') - TO_CHAR(fcr.actual_start_date, 'HH24:MI:SS') diff_But that doesn't work - I get an ORA-01722: invalid number error.
I also tried:
, TO_CHAR(fcr.actual_completion_date - fcr.actual_start_date, 'DD-MON-YYYY HH24:MI:SS') diff_But got an ORA-01481: invalid number format model error
In my application I show the Date in Hijri using the NLS setting. but the issue that "i face a deference between the real hijri date with oracle hijri date"
Assume that the real hijri date on 18-SEP-2012 was 02/11/1433 in hijri but in oracle was 03/11/1433
when I execute the following query it shows me "1433/11/03", but the actual Hijri date is "1433/11/02"
select to_char(to_date('20120918','YYYYMMDD'),'YYYY/MM/DD', 'NLS_calendar='''||'ARABIC hijrah') FROM DUAL;
In one of the query used like below is it correct or any need to be correct for date format? currently it's returning two tyoe of sets 1.NUll 2.01-JAN-00
SELECT withdrawn_date FROM csd where NVL(csd.withdrawn_date,'01-JAN-1900') = '01-JAN-1900';
during application migration, i got one table from MS Access, and have situation where two events are splited into 4 columns (start: date1 time1 and stop: dat2 and time2). How to properly calculate duration between these two events, and show it in format: hh:mi ?
I have a simple question, hope it has a simple answer. I changed the default date format for a SCHEMA using a TRIGGER and AFTER LOGON, so it set the NLS_DATE_FORMAT='YYYY-MM-DD HH24:MI:SS'. It does work fine, however, the problem is when I connect using a client with JDBC driver. When using SQL PLUS I get the date in the format specified above YYYY-MM-DD HH24:MI:SS, however, when using a client (Aqua Data 6.5.8 I know it is kinda old) and SQuirrel SQL 3.4.0 I always get the date in the YYYY-MM-DD format. I started to think that the issue is with the JDBC because it works fine when I connect with SQLPLUS.
follwing is my structure and data in table. COLA has datatype varchar2.data in table is date..... now i want to convert all the dates in 'yyyymmdd' format.
IS it possible?
SQL> select * from taba;
COLA --------------- 1944-02-10 1982-07-20 08/24/1974 03/14/1957 22-Nov-79
While am working with Decode just found something, why it is returning like this.
I Ran this query where i have used all the date format as DD/MM/YYYY SELECT DECODE(TO_DATE('25/04/2001','DD/MM/YYYY') , TO_DATE('01/01/1900','DD/MM/YYYY'), NULL , TO_DATE('25/04/2001','DD/MM/YYYY')) TEST FROM DUAL
Quote: TEST ------------- 25-APR-01
But the resule i got in DD-MON-YY
i tried searching this forum with searching strings Decode date format.. or similer i found nothing.
qry:= 'to_date(debtodt, 'dd-mon-yy')< sysdate'; or qry:= 'debtodt < to_char(sysdate, 'dd-mm-yyyy'); or qry:= 'to_date(debtodt, 'dd-mon-yy')< to_date(sysdate, 'dd-mm-yy')'
all these are showing error in oracle form.
in database debtodt is in char format , calculating from-- TO_CHAR(add_months(b.FRMDT,b.period)-1,'dd-mm-yyyy')
and also in oracle form it is char,thats why i am changing it either debtodt into date format or sysdate into char format. but it is showing error as: encountered the symbol "DD" when expecting one of these.................
the same query
select * from debar_reg_vu where to_date(debtodt, 'dd-mm-yyyy')<sysdate;
I am getting daily basis data from third party in excel format which i am converting into CSV format and then uploading into oracle tables using External tables.Now problem is that every time i getting the dates in diff format i.e. sometimes dd-mon-yyyy , dd/mm/yyyy etc.
Now every time i have to open my code and change it there ...to make it as oracle date format. IS there way i can find out format of date and based on format i can do operations with getting errors every time.
I am storing the TP(Excel date) date into varchar columns only and then varchar2 column value i m inserting/updating into date format using to_Date ().
CREATE OR REPLACE VIEW V_CATALOGUER_REPORT (COUNT, EVENT_USER, TO_DATE, SHORT_NAME) AS SELECT COUNT (DISTINCT A.PART_REF),A.EVENT_USER, TO_DATE(A.EVENT_DATE, 'DD-MON-YY'),B.SHORT_NAME FROM J_SUPPLY_CHAIN_HIST A, J_SOURCE B
[code]...
i created one view,i link two tables ,i can see the correct data in this view,but the result from front end application is not correct.i cant see the dates are correct.
I have a question regarding this date format change. Would there be any impact to database if i change the NLS DATE FORMAT as above example (date and time) at database level /system level ?
select TO_DATE( TO_CHAR(CAST((B.EOAWDTTM_MODIFIED) AS TIMESTAMP),'YYYY-MM-DD-HH24.MI.SS.FF'),'YYYY-MM-DD') from PS_SR_EX_ER_AW_VW B where rownum < 5
and It gives me the error
ORA-01830: date format picture ends before converting entire input string 01830. 00000 - "date format picture ends before converting entire input string"