I want to upgrade all the Oracle 10g Release (10.2.0)master sites (bi-directional) databases to Oracle 11g Release (latest). In fact, we are using bi-directional oracle streams and snapshot replication, it means capture,propagate and apply process is running.
I want to remove the master site which is in the multi master replication environment.
I have a doubt here. When I try to suspend the master activity,I need to give the gname.
BEGIN DBMS_REPCAT.SUSPEND_MASTER_ACTIVITY ( gname => 'NAGADMIN'); END; /
Where gname=master group name.But I have 9 master groups in my database. If i give one of the gname present in the master site will suspend the replication of the entire database from the replication.
eg; i am only giving NAGADMIN gname in the suspend activity script.. I have other gnames like, NAGUSER,NAGAUTH, etc....
I Have configured the replication between two database's at table level. After few miniuts of successful configuration of replication between two db's at table level, I am getting the ORA-00001: unique constraint (%s_PK) violated error in dba_apply_error.
I checked constraint name,type and status on table replicated is same on both source and destination db.
We want to replicate the data between the databases.We have 4 databases in a network.If there will be any change in database 1,e.g. updation in any table,it should automatically replicate on other 3 databases.or user will change something in database 2 ,it should replicate on other 3 databases and vice versa. All 4 databases have same schema and same configuration.
I need to set up replication between three 10g R2 databases.There will be one main database where the data will flow into two small databases. A little bit of information will flow back from these smaller databases into the main one.
I have been asked to evaluate ODI as an option. Unfortunately I cannot use Golden Gate due to the cost.I've had a play with ODI and it looks like it's all done on a GUI where I would much prefer to be using command line scripts for setup and monitoring.
It also looks like ODI is more geared to integrating data from many different sources but I'm just going from Oracle to Oracle so don't know if it's a bit overkill.
I'm thinking of just looking at CDC which I can set up with scripts and looks to be the basis behind ODI anyway (when it comes to taking data from Oracle) - again. I may even go down the streams route that I have used before.
We are planning upgrade three 32-bit 9i databases (on three physical machines) to a single 64-bit 11g VMware box. Average size of DB is 300GB.Planning to move the first 9i DB by the end of this month, followed by 2 and 3.How to do this using hot backup?
I have a multimaster replication between 2 sites (BASE1 and BASE3). BASE1 is the master definition site. I want to add a new master site without acquiescing the master group (named GM_ADMINISTRATEUR).
First, I have used the script provided by Oracle :
The first time, I had Errors, so I use the command
DBMS_REPCAT.UNDO_ADD_NEW_MASTERS_REQUEST
and I drop the master site BASE2 (connected as repadmin to BASE2 site).
The master site BASE2 is not present at BASE1 master definition site, The master repgroup is not present at BASE2 BUT, the master site BASE2 is always present at BASE3 master site. I think that the command UNDO_ADD_NEW_MASTERS_REQUEST undo the changes on BASE1 (the master definition site) but don't undo the changes on the site BASE3.
And now, when I want redo the add_new_masters, the command
DBMS_REPCAT.ADD_NEW_MASTER return a error on the command ADD_NEW_MASTER in the DBA_REPCATALOG for the following reason: ORA-00001: violation de contrainte unique (SYSTEM.REPCAT$_REPSCHEMA_PRIMARY) ORA-06512: � "SYS.DBMS_REPCAT_UTL", ligne 4484 ORA-06512: � "SYS.DBMS_REPCAT_RPC", ligne 1758
And I can't continue because the new master site BASE2 does not appear at BASE1 master definition site. I think I have to drop the master site BASE2 at the master site BASE3, but I dont know how to do this.
**** Following information at BASE1 (master definition site : ***** prompt Replication schemas/ sites Replication schemas/ sites select sname, masterdef,
IN M.V. SITE , and i am getting following error while creating REPGROUP CODE SQL> BEGIN 2 DBMS_REPCAT.CREATE_MVIEW_REPGROUP ( 3 gname => 'emp_repg', 4 master => 'orc1',
while replicating the master site via materialized views, in mViewGroups i issued:
BEGIN DBMS_REFRESH.MAKE ( name => 'mvadmin.hamza_refg', list => '', next_date => SYSDATE, interval => 'SYSDATE + 1/1440', -- for test purpose i used such a small interval implicit_destroy => FALSE, rollback_seg => '', push_deferred_rpc => TRUE, refresh_after_errors => FALSE); END;
in my previous attempt it worked all fine... i had a change in senerio, so i did my replication again from scractch using the same old spool in a new installation but even after 3 tries on replicating from scratch my objects are not getting refreshed automatically. even when i attempt to refresh the group it does not work. it works only when i refresh each of the participating object of the group manually.
I have 3 sites which want to be updated as soon as the other one updates its data.(in 5 seconds). So I have chosen multi master solution,sync regardless of the resource consideration.
1-what is the difference between multimaster async and updatable materialized view regardless of resource consuming in multimaster?because in both of them each site can receive and also propagate the data...I just know that in materialized view we can work offline and then apply it manually is there any other thing?
2-I can not understand the difference between multimaster sync and async (considering the 5 seconds,because 5 second is a little time)I mean in this case are they different from each other or not.
I have 8 databases in multi master replication. I need to replicate only one rep object in to master sites. But I have 8 rep objects in the master definition site. is it possible to replicate the required rep object only without bringing the other rep objects in to replication.
am trying to downgrade my oracle database 10g release 10.2.0.2.0 to 10.2.0.1.0the reason for this is that i had to copy /oracle_home/bin utilities from 10.2.0.1 to 10.2.0.2 because of this most utilities like rman,dbca were not working.
i think i need to downgrade my oracle database 10g release to 10.2.0.1.0 right?i read some oracle documentations of database downgrade instruciting me to
>take full backup of oracle DB >ORACLE_HOME/bin/emctl stop dbconsole SQL> STARTUP DOWNGRADE DROP USER sysman CASCADE; >SQL> SPOOL downgrade.log
Actually am trying to replicate two db servers from one in hong kong and another in china. when am trying to establish the replication, am getting error 'ORA-04052: error occurred when looking up remote object' like this...
but the same way i have tried in my local network, it is working fine.i have tried schema replication through enterprise manager grid control..
we need to find the key pressed action and key release action on Oracle form 10g. On key pressed (i.e. key-up, key-down, key-page-up and key- page-down) the event will be fired and as soon as the user release the key, the event will be stop.
As current situation, we have one form which contains the database blocks. As per search condition, all the data populated in Database block, there are 1000 and more records. Now user going use any of key (i.e. key-up, key-down, key-page-up and key-page-down) as he pressed key ( say Key- down) it scrolled down but as soon as he release the key, the event is not stopped. its going on going down then stop.
Is it possible, as user release the key scrolling will stopped at same time ?
Along with existing RMAN backups we do Exports - of our DB using and OS User and Oracle Wallet.Of the DB's we have upgraded the Data Pump Directory
Select * from dba_directories; (there are other commands to get this info as well).
I captured screens from the DBUA upgrades, but did not see an option to change this information.Is there a way to feed this information to the install moving forward. IE, ./DBUA -silent ?
Also, anyone tracked the percentage of storage increase from 10.2/11.1 to 11.2.
why we seem to be unable to report against the ap invoice hold release date using Discoverer in Oracle 11.5.10? the person who wrote our current report used a decode statement to look at the last update date of the release lookup code to create a release date, but i am trying to recreate this in a different tool (Qlikview) and just wanted to understand why we seem to be unable to report on the field as is!
I have the task to migrate the total databases(Exact copy to be moved to another server).The current server is going for format.After I did the following steps I am getting the tablespaces(databases)-4 sizes same ,but I am facing issue like some default tablespaces i.e temp,system are not matching.
temp tablespace *************** current server - 4.0(approximately) Migrating server - 160 MB
System tablespace ***************** current server - 580 MB Migrating server - 220 MB
Also I checked the tables are also matching for the 4 databases.Also Provide the solution or method which is correct.
steps done for migrating(By me) ******************************** EXPORTING DATA USING DATAPUMP *********************************
1 From command prompt MKDIR 'c:oraclexeapp mp';
2 From SQL prompt conn system/kotak;
3 create or replace directory dmpdir as 'c:oraclexeapp mp';
4 grant read,write on directory dmpdir to kotak;
5 From command prompt
expdp system/kotak@xe full=Y directory=dmpdir dumpfile=xe.dmp logfile=expdpxe.log; IMPORTING DATA USING DATAPUMP ***************************** in another server machine
1 From SQL prompt conn system/kotak;
2 create or replace directory dmpdir as 'c:oraclexeapp mp';
I am going to upgrade database from 11.1.0.7 to 11.2.0.3
1) If compatible is set to 10.2.0 in 11.2.0.3, will it work ? 2) If compatible set to maximum level, will it affect our application ? 3) Whether any code related problem occurred after upgrading like PL/SQL codes ?
We are planning to upgrade our database from Oracle Database 10g Enterprise Edition Release 10.2.0.1.0 - 64bi to Oracle Standard Edition 11g . We also have oracle apex installed on Oracle Database 10g Enterprise Edition Release 10.2.0.1.0 - 64bi database with oracle apex 3.1
No our plan to upgrade the database and oracle apex to 4.2. Since Oracle Enterprise Edition is licensing is very expensive we though of buying standard edition and upgrade to this version.
can we upgrade the oracle database from enterprise edition to latest standard edition?
I want to configured A Synchronous replication in oracle 8i. Noe using GUI i am bale to create replication but whatever i modify it remain in the transaction i have to manually run the job ,
I also tried to configured continuous asynchronous configuration by setting delay rate 500000. but it was also not working.
Is it possible to replicate table data on real time from sql server (2005 32 bit or sql server 2000 32 bit)to oracle 10g running on linux 64 bit? If yes then what are the steps.
It will be one way replication from sql server to oracle. Which option is best sql server dts or Oracle Stream replication to replicate table data.