insert into sample values('1','01-JAN-2005');
insert into sample values('1','1-JAN-2006');
insert into sample values('2','2-JAN-2007');
insert into sample values('3','4-JAN-2005');
insert into sample values('4','11-JAN-2004');
insert into sample values('3','2-JAN-2005');
insert into sample values('2','12-JAN-2006');
insert into sample values('1','21-JAN-2005');
insert into sample values('2','11-JAN-2005');
insert into sample values('7','01-JAN-2005');
[code]....
Query 1: SELECT DISTINCT YR FROM( SELECT TO_CHAR( ADD_MONTHS (TRUNC (TO_DATE('01/01/2007' ,'DD/MM/YYYY'), 'YYYY'), 1*LEVEL -1) , 'YYYY') YR FROM Dual CONNECT BY LEVEL <= MONTHS_BETWEEN(TO_DATE(:to_dt ,'DD/MM/YYYY'), TO_DATE('01/01/2007' ,'DD/MM/YYYY')) + 1 ORDER BY YR )
Gives the Output as YR **** 2007 2008 2009 2010 2011
Query 2 ******* SELECT DISTINCT MONTH FROM( SELECT TO_CHAR( ADD_MONTHS (TRUNC (TO_DATE('01/01/2007' ,'DD/MM/YYYY'), 'MM'), 1*LEVEL -1) , 'MM') MONTH FROM Dual CONNECT BY LEVEL <= MONTHS_BETWEEN(TO_DATE(:to_dt ,'DD/MM/YYYY'), TO_DATE('01/01/2007' ,'DD/MM/YYYY')) + 1 ORDER BY MONTH ) Gives the Output as
select b.penjara_id, p.penj_lokasi, a.no_daftar, b.episod, b.nama1,to_char(a.trkh_mula_prl,'dd/mm/yyyy') as trkh_mula_prl, to_char(bulan_proses,'mm/yyyy') as bulan_proses, b.epd, b.lpd from prl_daftar_proses a, senarai_pesalah b, penjara p
where a.no_daftar=b.no_daftar and a.episod=b.episod and b.penjara_id = p.penjara_id and a.setuju_jplp is null and a.bulan_proses between to_date(:FROM,'dd/mm/yyyy') and to_date(:TO,'dd/mm/yyyy') order by b.penjara_id, a.bulan_proses,a.no_daftarHi,
how i can insert only month and year from the value that have full date in the database?
for example,the date is 09/18/2012, but i just want to insert 09/2012 as parameter. If i want to insert only one parameter, i can do that..But i have problem when I want to insert two parameters..
I am populating a time dimension table. One job is to assign business day with sequence number on monthly basis and by year. Business day does not include weekends and all federal holidaies.
I created a PL/SQL block to handle this job. It works. However, I haven't figure out how to pass the month number and year number into PL/SQL block automatically. Now I have to manually enter year and month number (on Toad) to pass to block to make it work. If I create it as stored procedure and write another block to call it, I can pass year and month number into parameter there like this:
exec my_sp_name ('1', '2013');
But all of these are not good enough. I want to use code to automatically pass yesr and month number into PL/SQL block. So that I can make it better. . here is the PL/SQL block I created.
declare i number := 1; begin for r in (select * from time_dim where calendar_month_number = &month and calendar_year= &year and business_day_flag = 'B' order by date_sk_id) loop
ADD_REWARD_sp. Given the identifier of a project, add a new reward for the project. The procedure should return a unique identifier for the reward. The month and year indicated should be greater than or equal to the current month, or an error message should be generated. The pledge amount should be greater than zero. The number of backers, if not NULL, should be greater than 1. If the project is not found, generate an error message.
This is the procedure head:
create or replace PROCEDURE ADD_REWARD_sp( p_proj_id IN NUMBER, p_pledgeAmt IN NUMBER, p_rewardDesc IN VARCHAR2,
[code]...
Basically, what I am struggling with is how to check if th month and year is greater than or equal to current month. I suppose it would be easy with just checking SYSDATE, but in this case I need to use both month and year.
?I have the following requirement, the output should be:
Ticket count (sr_number) % of tickets inside DL Number of tickets inside DL Average cycle time (cycle time = closed date - created date) Total cycle time (cycle time = closed date - created date) Number of reassignments (sum)
DL - (deadline) formula is, closed date <= target_date
This should be displayed, grouped by year, then month and then by assignment group. The values should be in descending order(dates) Not sure how group by will work here.I am able to write the basic code for the above, but group by based on year, month and assignment group is pretty confusing to me.
which I need to pass parent_db_name as argument like schema name dynamically.
but i m unable to user it in cursor select query. Would any body tell me how will that be used in select query in cursor ?
create or replace procedure MyEvPro(new_court_code NUMBER, parent_db_name VARCHAR2) is CURSOR c_evidence is SELECT GET_CASECODE(CASECODE,new_court_code) as NEW_CASECODE,COURT_CODE,EVIDENCE_NUM,ONDATE,REC_STATUS,UNITS_EARNED,CASECODE FROM parent_db_name.CASE_EVIDENCE_CHARGES WHERE GET_CASECODE(CASECODE,new_court_code) IS NOT NULL ORDER BY EC_CODE ASC;
'Can we pass a dynamic collection variable to the procedure that is called from dbms_job.submit'
I have a package my_package with:
1. record type: ocv_rec
2. collection type: varr_ocv_rec varray(100) of ocv_rec
3. record type: ext_id_rec
4. collection type: varr_ext_id_rec table of ext_id_rec index by pls_integer
5. procedure: analyze_error_152_ll
6. procedure: get_ext_ids_152( v_db_ssa_dtl in varr_ocv_rec, ext_id_type in varchar2, ext_ids out varr_ext_id_rec)
Now here is where the issue resides:Within the definition of analyze_error_152_ll (in body of my_package), I call get_ext_ids_152 using dbms_job.submit
I want to get data for month to date. For example, If I pass today or any day date as parameter then i should get data for that month(month of passing date) up to passing(parameter) date. As well as i have to get year to date.For example, If I pass today or any day date as parameter then i should get data for that financial year(year of passing date) up to passing(parameter) date. how to get month to date and year to date data.
ORA-06502...I have database on oracle 9i on Solaris 9. I create a generate procedure that create dynamic procedure through DBMS_SQL. On this database I got the ORA-06502 error. When I tried to run the same procedure on the same database on oracle 8i on NT this work fine.
, I'd like to create a constraint (when creating a table) that checks to ensure that the 'Year' entered is less than or equal to the current year (based off SYSDATE). Per the code below, I keep getting the same error, "missing right parenthesis". I've spent more than an hour trying different ways to get this to work, but I've been failing miserably. I am using Oracle 11g Express.
CREATE TABLE TEST (Name VARCHAR2(7) PRIMARY KEY, Year NUMBER(4), CONSTRAINT TEST_YEAR_CK CHECK (Year <= (TO_NUMBER(TO_CHAR(SYSDATE, 'YYYY')))FROM DUAL); *ERROR at line 4:ORA-00907: missing right parenthesis
mucking on an Oracle 11.2 database, simple range partitioning issue. Seems using a "complex" formula inside the AT clause annoys it? Or am I doing something wrong?
I create the table with RANGE partition just fine:
CREATE TABLE my_part_tab ( id number, sdate date ) PARTITION BY RANGE ( sdate ) ( PARTITION P2013Q1 VALUES LESS THAN ( TO_DATE('01-jan-2013','dd-mon-yyyy') ), PARTITION P2013Q2 VALUES LESS THAN ( TO_DATE('01-jul-2013','dd-mon-yyyy') ), PARTITION P2013Q3 VALUES LESS THAN ( TO_DATE('01-oct-2013','dd-mon-yyyy') ),
[code]...
Table created.(and yes, I'm aware of INTERVAL option that'll do this next part "automagically", however, INTERVAL and REFERENCE partitioning are incompatible, and the child table is using REFERENCE partition). to make things easier on DBA for future, I'm trying to create a script that makes added a year's worth of partitions less manual.So far, I have the following working:
ACCEPT lYear PROMPT "Add Paritions for which calendar year?" ALTER TABLE my_part_tab SPLIT PARTITION PMAX AT ( TO_DATE('01-apr-&lYear','dd-mon-yyyy') ) INTO ( PARTITION P&lYear.Q1,PARTITION PMAX ); ALTER TABLE my_part_tab SPLIT PARTITION PMAX AT ( TO_DATE('01-jul-&lYear','dd-mon-yyyy') ) INTO ( PARTITION P&lYear.Q2,PARTITION PMAX );
[code]...
But no luck ...Same issue with other variations:
ALTER TABLE my_part_tab SPLIT PARTITION PMAX AT ( (ADD_MONTHS(TO_DATE('01-jan-&lYear','dd-mon-yyyy'),12)) ) INTO ( PARTITION P&lYear.Q4,PARTITION PMAX ); ALTER TABLE my_part_tab SPLIT PARTITION PMAX AT ( (TO_DATE('01-jan-'||TO_CHAR(TO_NUMBER('&lYear')+1,'fm9999'),'dd-mon-yyyy')) ) INTO ( PARTITION P&lYear.Q4,PARTITION PMAX );
Using Oracle 11g...We have a table in our database of data with the following information:
MASTER_RECORD, MEMBER_RECORD, BUSINESS_UNIT, GENDER, DOB (date), age [at time of month_record], MONTH_RECORD (date) [31-MON-YEAR for recorded active month]
The table has ~55 million records. Existing index is only on MASTER_RECORD.There is now a need to create a view which is an aggregate count of member records, grouped by business_unit,gender, age per year. eg:
business_unit, gender, age, month_record, num_of_members -> for every combination unit5, F, 25, 31-JUN-2011, 622 unit3, M, 18, 31-MAY-2011, 573
The view can be created now, but, is not fast enough to be reasonably considered a view. This table is re-created every month from a procedure, so there is flexibility on how it is created. Use interval partitioning by year( something I have not experienced using), create an index on the month_record,then create view.
I have a requirement to list the data month wise dynamically where month data is also in the same table, hopefully the below posts should bring more clarity to my requirements.
I need to create PROCEDURE to create user in oracle
CREATE OR REPLACE PROCEDURE "CREATE_USER_ORACLE8" ( USER_ID in VARCHAR2, PASSWORD in VARCHAR2, ROLES in VARCHAR2, nReturnCode OUT NUMBER ) BEGIN [code].......
Compilation errors for PROCEDURE NOG.CREATE_USER_ORACLE8
Error: PLS-00103: Encountered the symbol "BEGIN" when expecting one of the following:
; is with authid deterministic parallel_enable as Line: 9 Text: BEGIN
i want that the customer execute PROCEDURE (user_id,password,PROCEDURE )
Using 11gR2, windows 7 client machine. I need to update the table missing_volume (below), where I need to calculate the estimated_missing column. The calculation of estimated_missing column for current month needs previous month numbers (as commented inside the code below). I want the output like the first table. Notice the records start from January, hence estimated_missing for January can't be calculated, but for the the rest of the months it can be done by simply changing 'yr' and 'mnth' (commented inside the code towards the end).
yr mnth location volume actual_missing expected_missing estimated_missing --------------------------------------------------------------------------------------------------------------------------------- 2013 January loc1 48037 24 57 2013 February loc1 47960 3660 53 24 2013 March loc1 55007 78 57 28 2013 April loc1 54345 72 58 77The code:
UPDATE missing_volume g
[Code]....
The code does calculate correct number for 'estimated_missing' as I run the code for each month, but the problem is while updating the current month it also erases the record for previous month. E.g. as can be seen below, after I updated April the column only has the record for April, previous month record is gone, similarly updating March removed February, etc. I can't understand why it's happening!! Here is the output I get:
yr mnth location volume actual_missing expected_missing estimated_missing --------------------------------------------------------------------------------------------------------------------------------- 2013 January loc1 48037 24 57 2013 February loc1 47960 3660 53 2013 March loc1 55007 78 57 2013 April loc1 54345 72 58 77
why it's happening (I mean where is the flaw in the code) and how to get the desired output (first table).
CREATE or replace PROCEDURE table_demo (tabname IN varchar2) IS cursor_name INTEGER; rows_processed INTEGER;
[code]...
There are no compilation errors.I call this code from the following anonymous block...
DECLARE X CHAR:='T'; BEGIN TABLE_DEMO(X); END;
This also compiles successfully and without any errors. It runs properly as wellHowever when I run 'select * from T'. Then system throws up the error of table or view does not exist.
I'm trying to create a trigger and procedure to go along with my DDL. Everything is created just fine, but when I try to execute an update on the table monitored by the trigger I get the following error:
update housing set group_num = 1 where room_num = 10
ERROR at line 1: ORA-00937: not a single-group group function ORA-06512: at "YANKEEFAN146.VIOLATION_CHK", line 6 ORA-04088: error during execution of trigger 'YANKEEFAN146.VIOLATION_CHK'
/* DDL */ create table violation_type (violation_num number(1) primary key, violation_def varchar2(100) not null) organization index tablespace mi257_data; [code]....